Technical Specification for Interactive Panels: Non-Discriminatory Guide

2026-11-26
Tender Drafting / Non-Discrimination / Public Procurement

How to Write a Technical Specification for Interactive Panels That Does Not Narrow Competition

A technical specification is not a product description. It is a description of a public need, written so that any supplier capable of meeting it can prove it. The moment a clause says "Brand X, or approved equal" with a feature list copied from one datasheet, the outcome is decided before the bids arrive. This guide explains how to write a technical specification for interactive panels that keeps non-discriminatory requirements intact inside a real tender: how to spot exclusionary parameters, how to replace brand and model names with performance and functional requirements, how to draft a usable equivalence clause, how to design scoring that does not smuggle a brand back in, and which public legal instruments the drafting rests on. Qtenboard supplies the product datasheets, model-level compliance pack, factory records and factory-direct documentation; the procuring entity owns the need, the wording, the evaluation and the award.

The distinction that matters most is between a requirement and a description of one product. "The panel shall resolve the smallest required text from the farthest seat in a 300–500 lux room" is a requirement; several manufacturers can demonstrate it. "86-inch ADS panel, model code LH86…, octa-core, 50 touch users via OPS" is a description of one product; only its supplier can comply. Both can be technically true. Only one is a defensible public specification. The same logic applies to certification: "official Google EDLA certification for the delivered model, with model-level evidence" is a licence-based gate that several certified Android lines can clear, while "certified by a named vendor's programme" is a supplier reference in disguise.

Product and company references follow Qtenboard's published material: EDLA Interactive Whiteboard with Official Google EDLA, Secure Access, Long-Term Support, Certified Android and OEM / ODM Ready; Interactive Whiteboard for Education and for Business; Interactive Table; LCD Video Wall for Retail, for CCTV and for Education; Indoor, Outdoor, OLED and LED Digital Signage; Payment, Queue and Info Kiosks; Industrial touch panel PC; Stand By Me TV; Desktop POS Terminal; the Interactive Flat Panel Bid Control Solution, Digital Signage CMS Solution, Qtenboard 9679 IFP Solution, Wayfinding System Solution, Education Solution, Interactive Flat Panel Size Calculate Tool and LCD Video Wall Size Calculate Tool; 4K UHD ultra-HD display, 40–100 point infrared touch, sub-6 ms response time and a three-year warranty; EDLA · ISO 9001 · CE · FCC with 3 Years Warranty Support; OEM / ODM / CKD / SKD; 180 Day Payment Terms; ROHS certified environmentally safe materials, FCC authorised wireless modules for US market compliance, ISO 9001 approved strict full-process quality control, Google EDLA Certified with Android Enterprise Device Compliance, EPEAT Gold certified eco-friendly electronic product standard and ENERGY STAR certified high-efficiency low-power performance; 2005 founding, 330,000 m² across three factories in China, around 1,000 skilled workers, exports to more than 100 countries and over 20 years as an OEM / ODM partner; in-house SMT, touch bonding, metal chassis production and 24-hour aging QC documented in the published factory video; the V100 Interactive Whiteboard Software Operation material; the News guides on auditing an interactive whiteboard factory and on interactive flat panel ports and buttons; and the published contact, warranty policy and multilingual site interface. These are provided as bid evidence, never as wording to be copied into a specification.

  • Output Brand-free specification clause
  • Method Performance over design
  • Gate "Or equivalent" with proof
  • Scoring Criteria + relative weight
  • Law GPA X · EU 42 · UNCITRAL · national
  • Region KG · KZ · RU · EAEU
  • Terms 180 days · 3-year warranty

Identifying exclusionary parameters before they reach the notice

Most narrowing is accidental. A well-intentioned writer copies a datasheet to save time, and the copied feature list becomes a de facto single-source clause.

Exclusionary parameters are rarely announced as such. They appear as an unusually exact number, a model code in a footnote, a certificate held by one manufacturer, a required local presence, or a bundle of characteristics that only one bill of materials happens to satisfy. Article X:5 of the WTO Government Procurement Agreement addresses the origin of the problem directly: a procuring entity shall not seek or accept, in a manner that would preclude competition, advice that may be used in preparing a technical specification from a person with a commercial interest in the procurement. In practice, that means a specification drafted from a single vendor's datasheet is already at risk, even if no brand name appears.

01 · Brand, model code or trade name

"Brand X 86" panel, model LH86…, or approved equal" — or a specification with no brand but a model-specific code in a drawing, a footer or a compatibility list.

Rewrite as the function the model was chosen for, with a demonstration method.
02 · Over-exact dimensional corridors

"Bezel 12.4–12.6 mm", "gloss 31–33 GU", "response 4.1 ms" — figures copied from one measurement report rather than derived from a room need.

State the outcome — legible, no stroke loss, no glare — and a tolerance that any compliant product can satisfy.
03 · One-holder certificates

"Must hold certification issued by laboratory Y to programme Z" where only one supplier can produce that exact document, although equivalent standards exist.

Name the standard and the property, and accept equivalent evidence by any appropriate means.
04 · Supplier-status requirements

"Bidder must be an official distributor / authorised dealer of the manufacturer" or "must maintain a service centre in city N".

Ask for a service outcome and a named legal entity; do not require a commercial status or a fixed address.
05 · Locked bundles and hidden features

An OPS module, a proprietary camera, a named CMS or a client app written into the panel requirement with no equivalent route.

Specify the interface and the capability; let the bidder choose the module or integration path.
06 · Processor or chipset by name

"Octa-core SoC, model 9679 / RK3588 / equivalent exact part" — a part number is a supplier reference too.

Require sustained performance, 4K decode formats, an OTA route and a frozen firmware baseline instead.
07 · Origin or production geography

"Manufactured in country N" or "factory must be located in region N" without a standards-based justification.

Use national or international standards as the reference, as procurement law typically requires.
08 · Unrelated qualification thresholds

Turnover, years in business, project count or staff numbers disproportionate to a panel supply contract.

Keep qualification requirements reasonable, non-discriminatory and proportionate to the subject matter, with the choice justified in the documentation.
Detection questionIf the answer is "only one", the clause is at riskWhat to record in the draft file
How many published product lines meet every numeric corridor exactly?One datasheet fits; others miss by an immaterial marginThe room condition that produced each number
Does any clause name a trademark, model, patent, design, specific origin, producer or supplier?Yes, with no "or equivalent" and no precision justificationWhy a functional description was not sufficiently precise
Can a bidder prove compliance by any appropriate means?No — one named certificate is the only accepted proofThe list of accepted evidence types
Was the draft reviewed by anyone with a commercial interest in the outcome?Yes, and the advice shaped the specificationAn independent review record and a market consultation
Are qualification requirements proportionate to the subject matter?No — thresholds exceed the delivery riskA written justification for each chosen requirement
Are all evaluation criteria and their relative weights published?No — some criteria are described only in general termsThe complete criteria list with relative importance
PrincipleIf a clause cannot be explained as a measured need, it is a product description.

The copy-paste mechanism, made concrete

A school wants a panel for a 96-seat lecture room. Someone copies a datasheet that happens to list a 3-in-1 USB-C port at exactly 65 W, an ADS panel, 40 simultaneous touch points and a cloud device-management solution free for one year. None of those figures is wrong. Together they describe a specific product family, and the specification now excludes a 4K UHD panel with 40–100 point infrared touch, a Type-C port, a three-year warranty and an EDLA-based management route simply because its charging wattage or DMS entitlement is written differently. The fix is not to lower the requirement; it is to state what the room needs — one cable for video, touch and device charging; a declared number of simultaneous writers demonstrated on the sample; a remote policy and update route; a warranty period — and let each bidder show how its product delivers it.

The same discipline protects Qtenboard's own published figures. 4K UHD, 40–100 point infrared touch, sub-6 ms response and a three-year warranty are legitimate evidence for a bid response; they become exclusionary only if a drafter writes them as exact corridors that no other product can satisfy. A supplier should be able to win with better evidence, not with a clause written from its own datasheet.

  • Run a two-manufacturer test: at least two published product lines should be able to comply.
  • Trace every number to a room condition: lux, viewing distance, concurrency, timetable.
  • Search the draft for codes and trade names: footnotes, drawings and compatibility lists included.
  • Record who advised on the draft: and keep the review independent.
  • Justify each qualification threshold: in the procurement documentation, not in an email.

Replacing brand and model names with performance and functional requirements

Article X:2(a) of the WTO Government Procurement Agreement states the method in one line: set out the technical specification in terms of performance and functional requirements rather than design or descriptive characteristics, where appropriate. Article X:2(b) adds the reference hierarchy: base the specification on international standards where they exist, otherwise on national technical regulations, recognised national standards or building codes. The EU Directive 2014/24/EU follows the same order in Article 42(3) — European standards, European technical assessments, international standards, then national standards, always with "or equivalent" — and Kazakhstan's Law on Public Procurement, Article 21(2)(2), similarly requires the technical specification to indicate national standards, then interstate standards, and only in their absence the functional, technical, quality and operational characteristics of the purchase.

Avoid — design, brand or supplier reference
Write — performance, function and evidence
"Brand X EDLA interactive whiteboard, 86-inch, model LH86…, or approved equal."
4K UHD output with a diagonal derived from the farthest seat using a published size calculation; official Google EDLA certification for the delivered model with model-level evidence.
"Octa-core 9679 / RK3588 platform, Android 15."
A certified Android platform with licensed GMS, a declared firmware baseline, a documented OTA and security-patch route, and sustained 4K60 decode demonstrated on the sample.
"Exactly 40 simultaneous touch points, 4.1 ms ink latency."
The declared number of simultaneous writers for the teaching workflow, demonstrated live with no stroke loss; ink latency within a stated ceiling, measured end to end.
"3-in-1 USB-C port, 65 W charging, ADS panel type."
One cable carrying video, touch-back and device power at a declared wattage sufficient for the institution's laptop fleet; port enumeration verified with the actual devices.
"Cloud DMS free of charge for one year, vendor Z console."
A remote device-management capability with visible firmware, patch level and last check-in per serial number; all licence periods and optional module costs priced separately.
"TÜV certificate from laboratory Y for low blue light."
An anti-glare surface, a low-blue-light preset reachable from a physical control, and model-level photobiological safety evidence for the delivered configuration; equivalent proof accepted.
"Manufacturer must have 330,000 m² of factories and 20 years of history."
Factory quality-control records, 24-hour aging, motherboard testing and touch calibration per serial number, plus a published warranty policy and spare-parts route.
"Bidder must be an official distributor with a service centre in city N."
A named legal entity, an authorisation chain, a signed service annex with covered locations and response commitments, and a named escalation contact.
"180 Day Payment Terms from the manufacturer."
Payment milestones following acceptance of delivered batches, with a stated credit period, incoterms, duties and taxes shown separately.
"EPEAT Gold, ENERGY STAR and ROHS badges as listed on supplier Q's site."
Compliance with the named environmental and energy standards for the delivered model, evidenced by an indexed compliance folder; equivalent documentation accepted.

Rewrite logic, not a preference list. The right column is neutral: a factory-direct EDLA panel, a distribution-channel Android display and an OPS-based Windows configuration can each respond to it with different evidence.

A complete brand-free floor clause

Model clause — display and platform floor The delivered interactive flat panel shall provide 4K UHD output at a diagonal derived from the farthest-seat viewing distance, a declared number of simultaneous touch writers demonstrated on the offered unit with no stroke loss, end-to-end ink latency within a stated ceiling, one-cable video, touch-back and device power over a USB Type-C connection verified with the institution's devices, icon-only physical controls for frequently used functions, official Google EDLA certification for the delivered model with model-level evidence or a documented equivalent platform with equivalent identity, application distribution and device-management capability, a declared firmware baseline with a documented OTA and security-patch route, a warranty period of not less than 36 months, and an indexed compliance folder covering the named safety, environmental and energy standards. No trademark, trade name, model code, patent, design, specific origin, producer or supplier is required or excluded. Equivalence shall be demonstrated at the sample stage and recorded in the compliance matrix.

Notice what the clause achieves. It keeps every hard requirement a school actually needs — resolution, concurrency, latency, one-cable behaviour, a licence gate, an update route, a warranty period, an evidence folder — while removing every supplier reference. Qtenboard can respond with its EDLA Interactive Whiteboard, model-level EDLA evidence, 4K UHD / 40–100 point infrared touch / sub-6 ms response, the three-year warranty, the Bid Control Solution, QC and 24-hour aging records and the 180 Day Payment Terms. Another bidder can respond with a different certified Android line, an OPS Windows path or a different service structure. The committee compares evidence, not logos.

Keep standards, lose badges. Referencing ISO 9001, CE, FCC, ROHS, EPEAT Gold, ENERGY STAR, IEC 62471 or an EDLA certificate by its standard name is legitimate; referencing "the certificate shown on supplier Q's homepage" is not. Where a report such as IEC 62471 is required, ask for a model-level laboratory document for the delivered configuration and file it in the same folder — the Qtenboard Certifications & Compliance panel lists ROHS, FCC authorised wireless modules, ISO 9001, Google EDLA Certified with Android Enterprise Device Compliance, EPEAT Gold and ENERGY STAR, and does not present that report as a standing badge.

Drafting an equivalence clause that actually works

"Or equivalent" is not a polite footnote. It is the hinge of a technical specification for interactive panels that is genuinely open: a structured mechanism with three parts — a permitted exception, an evidence route and an objective assessment. Article X:4 of the WTO GPA permits a reference to a trademark or a specific producer only where there is no other sufficiently precise or intelligible way of describing the requirement, and only if words such as "or equivalent" are included. Article X:3 asks for the same words where design or descriptive characteristics are used. Article 42(4) of Directive 2014/24/EU states the same product-neutrality rule and its narrow exception, while Article 42(5) adds the critical counterpart: where a tenderer proves by any appropriate means that its solution satisfies the requirements in an equivalent manner, the tender cannot be rejected for non-compliance with the referenced standard. The contracting authority must assess equivalence objectively and set the equivalence assessment criteria out transparently in the procurement documents.

PART 1

Narrow exception, on record

If a specific reference is unavoidable — for compatibility with an existing estate — state in the documentation why a functional description is not sufficiently precise. Keep the justification with the draft file. Compatibility is one of the recognised narrow grounds; preference is not.

PART 2

Evidence by any appropriate means

Accept a product datasheet, a model-level test report, a laboratory document, a sample demonstration, factory QC records or an equivalent combination. Do not make one named certificate the only door. The burden of demonstrating equivalence rests with the bidder offering the alternative, but the criteria for that demonstration must be published in advance.

PART 3

Objective assessment, no blanket rejection

Score equivalence against the stated function, record the decision per clause in the compliance matrix, and give the same clarification window and the same sample script to every bidder. A blanket rejection of an equivalent product without objective examination defeats the clause and invites a review complaint.

Equivalence elementWhat the documentation must containFailure mode it prevents
Permitted referenceThe specific reference, the words "or equivalent", and the recorded precision or compatibility justificationA hidden single-source clause in a drawing or footnote
Functional baselineThe performance and functional requirement the reference stands forEquivalence assessed against a brand instead of a need
Accepted evidence typesDatasheets, reports, sample demonstration, QC and aging records, or equivalent proofOne-holder certificate acting as an exclusion
Assessment criteriaPublished, objective and identical for all bidders, with relative importance where scoredEquivalence decided after bids are opened
Sample scriptOne frozen build, one demonstration sequence, one record per serial numberA newer demo build evaluated instead of the delivered unit
Decision recordCompliance matrix row: requirement, response, evidence page, equivalent accepted or rejected with reasonsAn unappealable "not equivalent" note
Clarification windowIdentical questions and identical deadlines for every participantInformal advice shaping the specification for one bidder
ResultA clause that widens the field without lowering any requirement.

A usable equivalence clause

Model clause — equivalence Where the procurement documents refer to a standard, a technical specification, a named interface or, exceptionally and with a recorded justification, to a specific make or source, the words "or equivalent" shall apply. A tender offering an equivalent solution shall not be rejected on the ground that it does not comply with that reference where the tenderer demonstrates, by any appropriate means, that the proposed solution satisfies the stated performance and functional requirements in an equivalent manner. The criteria for assessing equivalence, the accepted forms of evidence and the sample demonstration sequence are set out in this documentation and applied identically to all tenderers. Equivalence decisions, and the reasons for them, shall be recorded in the compliance matrix. A blanket rejection of an equivalent offer without objective examination shall not be made.

The clause also solves a practical problem for suppliers. Qtenboard's Interactive Flat Panel Bid Control Solution keeps the technical volume, the sample record, the compliance matrix and the delivered serial range on one controlled configuration; another bidder may use a product datasheet plus a distributor authorisation letter. Both are valid evidence routes. What the authority requires is the chain — requirement, response, evidence, decision — not a particular format.

  • Publish the equivalence criteria before bids are opened: never improvise them at evaluation.
  • Accept any appropriate evidence: one named certificate is a single-source clause in disguise.
  • Record the precision justification: compatibility is a reason; preference is not.
  • Use one sample script for everyone: same build, same sequence, same record.
  • Never reject an equivalent blanket-style: write the reason per clause in the matrix.

Scoring design: where a brand quietly returns

A brand-free specification can still produce a brand-only outcome through scoring, which is why non-discriminatory requirements have to govern the evaluation sheet as strictly as the technical clauses. Awarding extra points for "the highest published touch count", "the longest company history", "a service centre in the capital" or "a named vendor's certification" reintroduces exactly the references the technical clauses removed. Three public rules constrain this. Article X:7 of the WTO GPA requires tender documentation to include all evaluation criteria the entity will apply and, except where price is the sole criterion, their relative importance. Kazakhstan's public procurement guidance states that qualification requirements must be reasonable, non-discriminatory and proportionate to the subject matter, that unjustified overstatement can limit competition and lead to inefficient use of public funds, and that the customer must justify the choice of specific qualification requirements in the procurement documentation. Under Russia's Federal Law No. 44-FZ, Article 33, the description of the procurement object must not contain requirements that limit the number of participants, and the Federal Antimonopoly Service has repeatedly treated official dealer status, a fixed regional service centre or requirements directed at a specific manufacturer as competition restrictions.

Structure of a defensible evaluation. Criteria are published, measurable, tied to evidence and accompanied by their relative importance, while mandatory gates sit outside the score. The percentages shown describe the shape of such a scheme; the authority sets its own weights in the tender documentation.

Scoring design ruleCompliant formulationWhy the alternative narrows the field
Measure the requirement, not the maximumPoints for the declared concurrency demonstrated on the sample with no stroke loss"Highest published touch count" rewards a datasheet, not the room
Score outcomes, not corporate historyPoints for QC, 24-hour aging and calibration records per serial number"20+ years in business / 330,000 m²" is a supplier attribute, not a delivery outcome
Score service capability, not statusPoints for a signed annex, covered locations, spares list, escalation and a tested policy push"Official distributor / service centre in city N" fixes the channel and the address
Score lifecycle cost, not unit price alonePoints for a three-year cost table with consumables, visits and replacement matchingPrice-only or badge-only scoring hides the recurring line that decides year three
Publish criteria and relative importanceComplete criteria list with weights in the tender documentationUndisclosed criteria cannot be audited and invite a review complaint
Keep gates outside the scoreLicence, warranty, authorisation, acceptance acts as pass/fail with documentsScoring a yes/no field as a gradient is the common bid-protest trigger
Use identical clarification wordingSame questions, same deadlines, same sample script for every bidderInformal advice from an interested party shapes the specification for one bidder
Require evidence for every pointEach scored row resolves to a document, a page and a serial numberUnfiled claims become unverifiable advantages
TestCould a compliant supplier who has never spoken to the drafting team still win full marks?

Qualification requirements deserve the same scrutiny

Qualification is not evaluation, but it narrows the field earlier. Turnover thresholds, a minimum number of similar projects, a required local legal form or a fixed staff count should be proportionate to a panel supply and installation contract and justified in the documentation. Russia's FAS has also clarified that a customer may independently determine the functional, technical and quality characteristics of a product based on its needs, provided such requirements do not limit the number of participants and competition — and that grouping unrelated goods into one purchase can itself restrict competition where no technological or functional link exists. Both observations generalise: define the subject matter by its own functional and technological relationship, then let the market respond.

An evaluation sheet built this way also makes the commercial terms comparable. Qtenboard publishes 180 Day Payment Terms, a three-year warranty and OEM / ODM / CKD / SKD options; another bidder may offer a different credit period or a channel-based service package. Put both into a priced bill of materials with incoterms, duties and taxes shown separately, and score the three-year cost rather than the headline figure. A neutral tender compares structures, not slogans.

  • Publish every criterion and its relative weight: no undisclosed preferences.
  • Keep binary gates out of the score: licence, warranty and authorisation are pass/fail.
  • Score evidence, not attributes: QC records beat company history.
  • Keep qualification proportionate and justified: in the documentation, in writing.
  • Apply identical clarification and sample rules: the drafting file should show it.

Legal basis: public instruments behind each drafting rule

The rules above are not drafting preferences. They rest on public instruments whose text can be checked without contacting any vendor. The table maps each drafting rule to its source. The applicable text is the version in force in the procuring jurisdiction; national procurement law, international treaty obligations and any donor or development-bank procurement rules applicable to the financing all sit in the same review file.

  • WTO Agreement on Government Procurement (2012), Article X Technical specifications and tender documentation. X:1 — no specification with the purpose or effect of creating unnecessary obstacles to international trade. X:2(a) — performance and functional requirements rather than design or descriptive characteristics; X:2(b) — international standards first, otherwise national technical regulations, recognised national standards or building codes. X:3 — "or equivalent" where descriptive characteristics are used. X:4 — no requirement or reference to a particular trademark, trade name, patent, copyright, design, type, specific origin, producer or supplier, unless no sufficiently precise or intelligible alternative exists and "or equivalent" is included. X:5 — no competition-precluding advice from a commercially interested person. X:7 — tender documentation must include a complete description, conditions of participation, all evaluation criteria and, except where price is the sole criterion, their relative importance.
  • Directive 2014/24/EU of the European Parliament and of the Council, Articles 18(1) and 42 Equal treatment, non-discrimination and transparency as general procurement principles, expressed in technical specifications as product neutrality. Article 42(3) sets the standards hierarchy — European standards, European technical assessments, international standards, then national standards — always with "or equivalent". Article 42(4) prohibits references to a specific make or source, a particular process, trade marks, patents, types, or a specific origin or production where this favours or eliminates undertakings or products, with a narrow exception requiring "or equivalent". Article 42(5) bars rejection of a tender that proves by any appropriate means that its solution satisfies the requirements in an equivalent manner; equivalence criteria must be transparent and the assessment objective.
  • UNCITRAL Model Law on Public Procurement (2011) The Preamble states the objectives of economy and efficiency, participation by suppliers regardless of nationality, competition, fair and equitable treatment of all suppliers, integrity, and transparency. Chapter I requires procurement regulations to contain rules concerning the description of the subject matter of the procurement and the terms and conditions of the contract, and rules concerning evaluation criteria and procedures. The Model Law is a legislative template used in procurement-law reform and is expressly recommended to States when assessing or revising their procurement regimes.
  • Republic of Kazakhstan — Law on Public Procurement Public guidance on qualification requirements states that they must be reasonable, non-discriminatory and proportionate to the subject matter, that unjustified overstatement can limit competition and lead to inefficient use of public funds, and that the customer must justify its choice of specific qualification requirements in the procurement documentation. Article 21(2)(2) requires the tender documentation's technical specification to indicate national standards, then interstate standards, and only in their absence the functional, technical, quality and operational characteristics of the goods, works or services. The Law's stated principles include equal opportunity for suppliers, fair competition and transparency, with ratified international treaties taking precedence over national law.
  • Kyrgyz Republic — Law on Public Procurement Law No. 27 of 14 April 2022 (as amended, including 28 June 2024) bases public procurement on respect for the rights and legitimate interests of participants, openness, impartiality, publicity and transparency, and respect for participants' rights. Earlier Law No. 72 of 3 April 2015 stated the principles of publicity, openness, legality and impartiality towards suppliers, expansion of participation and development of competition, and equal and fair conditions for suppliers; its Article 14 required tender documentation to contain a detailed description of the subject of procurement with technical and quality characteristics and technical specifications. Published two-stage tender rules state that documentation consists only of technical, quality or operational characteristics, contractual terms and supplier qualification data, and that discussions with suppliers take place under the same conditions. Amendments adopted with most rules taking effect on 1 January 2027 add market monitoring before announcement, three-year planning, two-package evaluation, complaint review first by the procuring organisation within three business days and then by an independent commission, bid security capped at 2% and performance security at 10%, mandatory accessibility considerations and circular-procurement criteria.
  • Russian Federation — Federal Law No. 44-FZ, Article 33, and FAS practice Article 33 governs the description of the procurement object. Part 1 excludes requirements or indications that entail a limitation on the number of procurement participants; part 3 excludes requirements directed at the manufacturer of the goods, including in the form of quality, technical and functional characteristics or consumer properties, and requirements that a participant possess production resources. FAS clarifications state that the customer independently determines functional, technical and quality characteristics based on its needs, provided they do not limit the number of participants and competition; FAS decisions have treated official dealer status, a fixed regional authorised service centre and geographically limited warranty repair as competition restrictions, while also noting that combining technologically and functionally unrelated items into one purchase can restrict competition.
How to use this section. Cite the instrument that actually governs the purchase, name the article, and attach the applicable version to the drafting file. Where an international financial institution finances the purchase, its procurement regulations form an additional layer in the same review. The article numbers above are the public reference points for the drafting method; they are not a substitute for the applicable national text.

Drafting workflow and the final review

A neutral specification is produced by a sequence, not by a last-minute legal scrub. The five stages below keep the need, the wording, the market check and the evidence chain in the right order.

  • Stage 1

    Write the need, not the product

    Record room count, farthest-seat distance, maintained illuminance, concurrency, languages, offline needs, existing identity estate and service ownership. No brand, model or datasheet appears in this document.

  • Stage 2

    Convert each need into a measurable requirement

    Use performance and functional language, reference standards by name with "or equivalent", and define the demonstration method for each floor. State the accepted forms of evidence.

  • Stage 3

    Run market consultation and an exclusion scan

    Check that at least two published product lines can comply, search the draft for codes and trade names in footnotes and drawings, and record any advice from commercially interested parties. Publish clarification questions with identical wording and deadlines.

  • Stage 4

    Publish criteria, weights and the equivalence route

    List every evaluation criterion with its relative importance, separate mandatory gates from scored items, justify each qualification requirement, and include the "or equivalent" clause with its assessment criteria.

  • Stage 5

    Evaluate on a frozen sample and file the chain

    Record model, serial number, firmware version and checksum before demonstration. Score against the compliance matrix row by row, record equivalence decisions with reasons, and tie the sample to the delivered serial range and the acceptance acts.

Final review checklist

Review itemPass condition
Need descriptionEvery requirement traces to a measured room, workload or service condition
Design versus performancePerformance and functional phrasing used; descriptive characteristics accompanied by "or equivalent"
Supplier referencesNo trademark, trade name, model code, patent, design, specific origin, producer or supplier without a recorded justification and "or equivalent"
Standards hierarchyInternational or national standards named by designation, with "or equivalent" where applicable
Equivalence mechanismAccepted evidence types, assessment criteria and sample script published in advance
Evaluation criteriaAll criteria and their relative importance in the tender documentation; gates outside the score
Qualification requirementsReasonable, proportionate to the subject matter and justified in the documentation
Advice and conflictsIndependent review recorded; no competition-precluding advice from an interested party
Clarification uniformityIdentical questions, deadlines and sample conditions for every participant
Commercial comparabilityPriced bill of materials with credit period, incoterms, duties and taxes shown separately
Evidence chainCompliance matrix → sample record → delivered serial range → acceptance act → asset register
ResultA specification a reviewer can defend clause by clause, and several suppliers can answer.

Before and after

BeforeAfter
Specification copied from one datasheetRequirements derived from a signed need description
"Brand X or approved equal"Functional floor with a recorded precision justification where a reference is unavoidable
One named certificate accepted as proofEvidence by any appropriate means, assessed against published criteria
Highest published number wins pointsDeclared requirement demonstrated on a frozen sample
Official dealer status requiredNamed legal entity, service annex, spares and escalation
Weights decided at evaluationAll criteria and relative importance published in the documentation
Equivalence rejected in a single lineDecision recorded per clause with reasons in the compliance matrix
Demo unit on a newer buildModel, serial, firmware and checksum frozen before demonstration
8Exclusionary patterns
10Rewrite pairs
3Equivalence parts
6Public legal sources
0Brand names in clause
  • Write the need first: the room schedule precedes the technical volume.
  • Use performance language: outcome plus a demonstration method, not a part number.
  • Keep "or equivalent" operational: criteria, evidence and sample script published.
  • Separate gates from scores: and publish every weight.
  • Justify qualification thresholds: proportionality belongs in the documentation.
  • Run an independent exclusion scan: including footnotes, drawings and compatibility lists.
  • Close the serial chain: matrix, sample, delivery, acceptance and asset register on one version.

Frequently asked questions

These are the questions usually raised by procurement officers, legal reviewers, school IT teams and distributors drafting a technical specification for interactive panels with non-discriminatory requirements for a public tender.

What single change makes the biggest difference?

Stop copying a datasheet. Write a need description first — rooms, farthest-seat distance, illuminance, concurrency, languages, identity estate and service ownership — then convert each need into a performance or functional requirement with a demonstration method. Article X:2(a) of the WTO GPA states exactly this: technical specifications in terms of performance and functional requirements rather than design or descriptive characteristics, where appropriate.

Is "Brand X or approved equal" ever acceptable?

Only as a narrow, documented exception. Article X:4 of the WTO GPA and Article 42(4) of Directive 2014/24/EU permit a reference to a particular trademark, type, origin or producer only where there is no other sufficiently precise or intelligible way of describing the requirement, and only if words such as "or equivalent" are included. Record the precision or compatibility justification in the drafting file; a preference is not a justification.

What does an "or equivalent" clause actually have to contain?

Three parts: a narrow permitted reference with a recorded justification; an evidence route that accepts proof by any appropriate means — datasheets, model-level test reports, sample demonstrations, factory QC and aging records; and an objective assessment with criteria published in advance, one sample script for all bidders and a decision recorded per clause. Article 42(5) of the Directive bars rejecting a tender once equivalence is demonstrated by any appropriate means; a blanket rejection without objective examination defeats the clause.

Who bears the burden of proving equivalence?

The bidder offering the alternative solution. But the contracting authority must transparently set out the equivalence assessment criteria in the procurement documents and examine equivalence objectively. Publishing those criteria before bids are opened is what makes the burden fair and the decision auditable.

Can we require official Google EDLA certification without naming a brand?

Yes. EDLA is a licence, not a supplier. Write "official Google EDLA certification for the delivered model, with model-level evidence" as a mandatory gate, and allow a documented equivalent platform with equivalent identity, application distribution and device-management capability. What is not defensible is naming one vendor's certification programme as the only accepted proof.

Are exact numbers like 40 touch points or 4.1 ms discriminatory?

They are when copied from one measurement report rather than derived from a need. State the outcome — the declared number of simultaneous writers for the teaching workflow, demonstrated live with no stroke loss, and ink latency within a stated ceiling — and let each bidder prove it on the sample. Qtenboard publishes 40–100 point infrared touch and sub-6 ms response as bid evidence; those figures should win on evidence, not appear as exact corridors in the specification.

How should standards be referenced?

By designation, in the recognised hierarchy, with "or equivalent". GPA Article X:2(b) puts international standards first, then national technical regulations, recognised national standards or building codes. Directive 2014/24/EU Article 42(3) lists European standards, European technical assessments, international standards and then national standards. Kazakhstan's Law on Public Procurement, Article 21(2)(2), requires national standards first, then interstate standards, and functional characteristics only in their absence.

Can we require a local service centre or official distributor status?

Both are high-risk. FAS decisions under Article 33 of Law No. 44-FZ have treated official dealer status, a fixed regional authorised service centre and geographically limited warranty repair as competition restrictions, and Kazakhstan's guidance requires qualification requirements to be reasonable, non-discriminatory and proportionate. Ask instead for a named legal entity, an authorisation chain, a signed service annex with covered locations and response commitments, a spare-parts list and a named escalation contact.

Which evaluation details must be published?

All of them. GPA Article X:7 requires tender documentation to include a complete description of the procurement, conditions of participation, all evaluation criteria the entity will apply and, except where price is the sole criterion, their relative importance, plus payment terms. Undisclosed criteria cannot be audited and are a common source of review complaints.

Why keep mandatory gates out of the scoring?

Because a licence, a warranty period, an authorisation letter and an acceptance act are binary. Scoring a yes/no field as a gradient lets a lower price trade away a requirement, and it invites a bid protest. Put them in the mandatory list with an attached document and score only what measurably varies: demonstrated performance, service annex quality, three-year cost and training plan.

Can a supplier help draft the specification?

Market consultation is legitimate and useful; a specification shaped by one interested party is not. GPA Article X:5 prohibits seeking or accepting, in a manner that would preclude competition, advice used in preparing a technical specification from a person with a commercial interest in the procurement. Publish identical clarification questions and deadlines for everyone, and keep an independent review record in the drafting file.

What is the two-manufacturer test?

A practical exclusion scan: check that at least two published product lines can comply with every numeric corridor, and trace each number back to a measured room condition. If only one datasheet fits — and others miss by an immaterial margin — the clause is a product description. Note that FAS has clarified a customer is not obliged to write a description matching two specific registry manufacturers; the test is about competition, not a quota.

How do the Central Asian rules in this guide differ?

Kazakhstan requires a standards hierarchy in the technical specification and justified, proportionate qualification requirements. The Kyrgyz Republic bases procurement on openness, impartiality, transparency and equal conditions; its published two-stage rules limit documentation to technical, quality and operational characteristics, contract terms and qualification data, with equal conditions for discussions. Amendments with most rules taking effect on 1 January 2027 add market monitoring, three-year planning, two-package evaluation, a complaint route via the procuring organisation and then an independent commission, and mandatory accessibility considerations. Russia's 44-FZ Article 33 and FAS practice focus on not limiting participant numbers and not directing requirements at a manufacturer.

Is the UNCITRAL Model Law binding?

No. It is a legislative template that UNCITRAL recommends States use when assessing or revising their procurement regimes. Its value here is as a public statement of the shared objectives — competition, participation regardless of nationality, fair and equitable treatment, transparency — and of the requirement that procurement regulations contain rules on describing the subject matter and on evaluation criteria and procedures.

How do we keep commercial terms comparable?

Require a priced bill of materials with the credit period, incoterms, duties, taxes, optional modules and management subscriptions shown separately, then score the three-year cost of ownership rather than the headline unit figure. Qtenboard publishes 180 Day Payment Terms, a three-year warranty and OEM / ODM / CKD / SKD options; another bidder may offer a channel-based service package. Both are comparable when the lines are itemised.

What should be frozen before a sample demonstration?

Model code, serial number, firmware version and checksum, plus the demonstration sequence and the evidence record. A newer build on the demo table is a discrepancy, not an improvement. The Interactive Flat Panel Bid Control Solution is one published way to keep the technical volume, sample record, compliance matrix and delivered serial range on one controlled configuration; a product datasheet plus an authorisation letter is another.

How do we start a neutral specification for our own tender?

Write the need description, convert it to performance and functional requirements with demonstration methods, publish criteria, weights and the equivalence route, then run an independent exclusion scan and a market consultation with identical questions for all bidders. Qtenboard can supply its published compliance pack, product datasheets, factory-audit material and size-tool outputs as bid evidence; the wording of the specification remains the procuring entity's own.

Preparing a brand-free specification for your next panel tender?

Qtenboard supplies model-level EDLA evidence, product datasheets, factory QC and 24-hour aging records, a three-year warranty, 180 Day Payment Terms and OEM / ODM / CKD / SKD documentation from its Shenzhen manufacturing base — as evidence for a neutral compliance matrix, not as wording for the specification. Request the compliance pack and bid documentation.


Qtenboard Queenie Wang

Queenie Wang

CEO | Interactive Display & Collaboration Solution Expert

I am the founder of Qtenboard, bringing over 17 years of hands-on expertise to the touch display industry. Drawing on the global management perspective gained through my EMBA studies at ShenZhen University, I lead my team in optimizing every stage of our operations—from product definition to high-efficiency supply chain management—ensuring our manufacturing capabilities remain at the forefront of the industry.

As the leader of Qtenboard, I specialize in providing tailored OEM/ODM solutions for interactive whiteboards, LCD video walls, digital signage, and industrial-grade touch terminals. Backed by our 330,000 m² modern industrial park in Shenzhen, we maintain full-lifecycle control over industrial design, precision manufacturing, and rigorous performance testing.

With nearly two decades of project experience, Qtenboard’s display solutions are now deployed in over 120 countries and regions, earned the trust of more than 15,000 enterprise customers worldwide. If you are seeking a responsive partner with a deep manufacturing foundation for your customized touch display projects, my team and I are ready to support your vision with professional excellence.