Airport FIDS & Metro PIS Display Solution Qtenboard

2026-11-12
Qtenboard Transit

Transit hub display solutions · Airport · Metro · Rail

Airport FIDS & Metro Passenger Information Display Solution

From AODB and GTFS-Realtime feeds to platform-edge panels: 21.5–98 inch high-brightness terminals, IP65/IP66 enclosures, Android or Windows endpoints, CMS and transit-API integration — specified, built and burn-in tested before it reaches your station.

2,000 nits Peak brightness
IP65 / IP66 Enclosure class
110+ ประเทศที่ให้บริการ
840k m² Facilities
airport fids flight information display terminal hall Airport FIDS bank above a check-in hall: the panel is the last link in the AODB chain, not a standalone media player.

Where the budget goes

Three ways a transit display project loses money after handover

None of these failures appear in the factory. All three are decided in the specification phase, usually by whoever wrote the purchase order first — and they surface at site acceptance, when the timetable is already published.

Failure 01

The panel arrives, the player will not drive it

A screen bought on price has a fixed EDID and a fixed input set. The existing FIDS player or video matrix expects a timing mode the panel does not accept, or the installation assumes an HDMI path where the cabinet only offers VGA.

Cost at site: a replacement matrix or a replacement panel batch — plus the recabling that goes with either.
Failure 02

Noon washes out an open platform

An indoor 500-nit panel is specified for an elevated platform because the tender said "high brightness" without a number. Passengers read the backlight reflection, not the arrival time. The complaint arrives in summer, not at commissioning. Cost at site: panel swap on live platforms at night, with possession windows and re-testing.

Failure 03

The enclosure fails the acceptance test

The screens work. The paperwork does not: no IP report for that exact cabinet, no impact rating, no fire classification for the installed materials. The integrator cannot hand the asset over. Cost at site: delayed payment milestone, and a certificate nobody can produce retroactively.

Every section below exists to close one of those three gaps before the purchase order is issued — not to add features to a quotation.

Scenario matrix

One product line, three different duty cycles

Airport, metro and rail passenger information display projects share a display technology and share almost nothing else. The upstream data source decides the terminal count, the mounting position decides the enclosure, and the operator decides the acceptance route.

Hub type Data source & integration path Terminal positions Environment class What we specify most often
Airport FIDS Flight information display system AODB → FIDS server → player or video matrix; display receives a rendered video feed or a documented API payload Departure and arrival banks, gate podium, check-in row, baggage carousel, staff room, curb-side Indoor hall, plus semi-outdoor gate pier 55–85 inch, 700–1,000 nits, anti-glare glass, 24/7 rated panel, landscape layout
Metro PIS Passenger information system ATS / CBTC plus central PIS → station server or playback controller; per-station remote management Platform edge, concourse, passageway, lift lobby, elevated platform, depot notice board Indoor platform, plus elevated and canopy zones 43–65 inch slim profile, IP65, heater, dual-network endpoint, high refresh for next-train rows
Rail PIDS Passenger information display system CTC or central passenger information system → station server; timetable and platform allocation Platform, passageway, concourse, ticket gate line, waiting area, park-and-ride Semi-outdoor and fully open platform 55–75 inch, IP66, IK10 laminated glass, heater plus anti-condensation, wide viewing cone
metro platform passenger information display screen Metro platform installation: next-train rows, destination and interchange guidance share one slim panel mounted clear of the train envelope.

The same 43 inch panel can serve a metro platform and a small regional terminal. What changes is the enclosure, the brightness band, the mount and the acceptance package — not the product family.

Decision one

Is the screen a dumb terminal or a managed endpoint?

This single choice determines the interface list, the software owner, the failure path and the price. It should be answered before the tender, because it cannot be changed after the cabinet drawing is approved.

Type A

Matrix-driven video endpoint

The operator already owns a FIDS player or video matrix. The display is a pure sink.

Rendering owner Existing FIDS software, media player or matrix
อินเทอร์เฟซ HDMI / DVI / SDI input, EDID profile supplied against your player
We deliver Panel, driver board, matched input set, enclosure, mount, burn-in record
ดีที่สุดสำหรับ Airport halls and concourses where a central player already exists
Type B · most transit projects

Network-managed endpoint

Each panel is an addressable device on the station network, with no local PC in the riser.

Rendering owner CMS client on the panel — ours, or your PIS application as an APK
อินเทอร์เฟซ LAN / Wi-Fi / 4G / 5G, documented API, GTFS-Realtime compatibility assessment
We deliver Android 9 / 11 / 14 / 16 or Windows endpoint, remote monitoring, OTA update, watchdog
ดีที่สุดสำหรับ Metro and rail, multi-station estates, unattended platforms
Type C

Dual path with hardware override

Service alerts must beat advertising even when the network is down.

Rendering owner Normal content over network; emergency content over a separate video path
อินเทอร์เฟซ Dual input plus dry-contact / GPIO priority relay on the driver board
We deliver Dual-input cabinet, forced-source switching, tested override sequence at FAT
ดีที่สุดสำหรับ Safety-critical platforms, evacuation routes, tunnel portals

Typeface, right-to-left layout, multi-language rows and content priority are rendered by the player or the CMS — not by the panel. What the panel owes you is faithful reproduction: full colour range, no scaling artefacts, and a backlight that still holds its level after 50,000 hours. Any supplier who tells you the screen handles language rendering is selling you a software problem as hardware.

transit operations control room cms monitoring Control room view: one CMS console should show every station, every panel state and every failed update — without a site visit.

Specification bands

Specification bands by installation class

Use these bands to sanity-check a tender before you send it. The final numbers still have to come from a sun-path and viewing-distance study on the actual platform — a west-facing panel at 40°C needs a different answer from a covered concourse.

Installation class สถานที่ทั่วไป ความสว่างความสว่างสูง Ingress Glass & impact ความร้อน
Indoor, controlled24/7 duty Terminal hall, concourse, staff areas, ticket office 500–700 nits IP40, filtered intake Anti-glare, IK07 where public Fanless, L70 ≥ 50,000 h
รถกึ่งกลางแจ้งCanopy, elevated Gate pier, elevated metro platform, passageway, shelter 1,000-1,500 nits IP54 to IP65 Anti-glare plus laminated, IK08 Fan plus heater, anti-condensation
กลางแจ้งเต็มรูปแบบOpen platform Platform edge, bus interchange, park-and-ride, depot yard 1,500–2,000 nits IP65 to IP66 Anti-reflective laminated, IK10 Air-conditioning or heater, ISO 9227 salt fog for coastal
semi outdoor transit hub high brightness display enclosure Semi-outdoor enclosure under canopy: the housing, bracket and glass stack decide survival, not the panel specification sheet alone.

Brightness is not the whole answer. Contrast ratio under glare, glass haze level and the viewing cone at 15 metres decide whether a passenger can actually read a departure row from the queue.

การปฏิบัติตาม

What we hand over, and what stays with the project

Transit projects are audited on evidence, not on claims. We separate the two columns below in every quotation, so nobody discovers the gap during handover.

Supplied with the unit

Component and enclosure evidence, report per order.

  • CE — EMC and low-voltage directives
  • FCC, RoHS, CB where the destination market requires them
  • ISO 9001 and ISO 14001 quality and environmental management
  • IP test report to IEC 60529 for the exact cabinet supplied
  • IK impact report and safety-glass certificate for public-facing glass
  • EN harmonised standards for display and signage categories
  • ISO 9227 neutral salt-spray evidence for coastal sites, where specified
  • 72-hour burn-in record per unit, plus panel and image-quality inspection sheet

Stays with the project

We flag these in writing; the integrator and the authority commission them.

  • EN 50121-4 trackside EMC for cabinets and cabling inside the railway boundary
  • EN 45545-2 or GB 8624 fire classification of installed materials as a system
  • Structural wind, seismic and anchor calculation for pole and canopy mounts
  • Local electrical approval and CE marking of the assembled installation
  • Passenger-data privacy and public-information review with the operator
  • Site acceptance test and integration test with the live AODB, ATS or CTC feed
ip66 waterproof enclosure test outdoor display Sealing test on an outdoor cabinet: the IP claim has to survive the jet, the cable gland and the door gasket — not just the panel.

Qtenboard supplies component and enclosure evidence. System-level approval belongs to the integrator and the authority having jurisdiction. We will not tell you otherwise to win a purchase order — an approval you cannot produce is a payment milestone you cannot invoice.

การจัดส่ง

How a hub project is actually delivered

Nine gates, each with a document you can attach to a project file. A station list with a target opening date can be quoted from gate two; a cabinet drawing is released at gate five.

Gate 01 Confirm site and application Hub type, station list, mounting position, sun exposure
Gate 02 Define size, brightness, enclosure Class band, IP and IK target, thermal package
Gate 03 Confirm data source and integration Type A / B / C, API or video feed, interface document
Gate 04 Select CMS, network, modules Licence scope, connectivity, optional peripherals
Gate 05 Approve cabinet drawing and branding Enclosure drawing, mount, signage, colour, logo
Gate 06 Produce sample or pre-production unit Pilot station unit for operator sign-off
Gate 07 Function and burn-in testing Boot, CMS playback, API display, thermal, long-run burn-in
Gate 08 การตรวจสอบก่อนจัดส่ง Sealing, cable entry, mechanical dimension, photo record
Gate 09 Handover pack Packing list, drawings, installation guidance, spare-parts list
factory burn in test of outdoor transit display Burn-in rack: every unit runs a long-duration cycle before packing, so early failures happen in our factory rather than on your platform.
Work package Operator Platform / PIS software vendor Integrator Qtenboard
AODB / ATS / CTC feed Owns the data Exposes the interface Requests access Documents what the panel can display
CMS and content logic Approves content policy Owns PIS content rules Configures Supplies CMS licence, or the endpoint to run yours
Panel, enclosure, mount Approves drawing — Installs Designs, builds, tests, ships
Integration test Witnesses Runs the data side Coordinates Joins, with a test unit or remote support
Acceptance and asset handover Signs off Signs off data scope Signs off installation Supplies test records and certificates

Project evidence

Deployments we can talk about, and what they changed in the specification

Client names are withheld under NDA. What we can share is the configuration, the problem that appeared after commissioning, and the change we now write into every similar quotation.

railway station platform departure display board
Metro · 12 elevated stations · coastal

Condensation at dawn, not rain at noon

43 inch slim PIS panels, IP65, heater and dual-layer glass on open elevated platforms. Commissioned in autumn, the failure appeared at 6 a.m. in the first cold snap: fog on the inner glass, timetable unreadable for 40 minutes.

Change adopted: heater duty cycle tied to dew-point sensor, anti-fog inner glass as standard on coastal elevated sites.

airport gate pier flight information display screen
Airport · regional terminal · 4 banks

Keeping the operator's existing FIDS player

75 inch departure and arrival banks, Type A matrix-driven endpoints at 1,000 nits. The operator refused a new software licence, so the panels were specified against the EDID and timing mode of the existing player, with a test unit sent to the operator's lab first.

Outcome: no additional CMS licence, no change to the AODB contract, commissioning inside the original closure window.

railway station concourse multi screen display wall
Rail · interchange concourse · 3 × 3 wall

An override path that survives a dead network

55 inch panels at 700 nits, 3.5 mm bezel, video wall controller plus a Type C dry-contact override. During the evacuation drill the network was deliberately isolated; the wall switched to the emergency source with no operator input.

Outcome: override sequence tested at FAT and re-tested on site, written into the operator's drill procedure.

Reference calls and project files are released after a mutual NDA. We do not publish client logos or site photography without written permission, and we do not present stock imagery as a delivered project.

OEM / ODM

What can be fixed in the drawing, and what cannot change later

Transit cabinets are almost never catalogue items. The list below is what we can lock before production; anything outside it should be confirmed in writing rather than assumed from a brochure.

หน้าจอแสดงผล 21.5–98 inch, 2K or 4K, 700–2,000 nits, anti-glare or anti-reflective glass, portrait or landscape
แพลตฟอร์ม Android 9 / 11 / 14 / 16 or Windows; CPU, RAM and storage matched to your CMS or PIS application
สิ่งที่แนบมา Powder-coated steel or stainless cabinet, IP54 to IP66, IK-rated glass stack, sealed cable entry
ความร้อน Fan, heater, air-conditioning or fanless; dew-point control for coastal and elevated sites
การเชื่อมต่อการเชื่อมต่อ LAN, Wi-Fi, 4G or 5G; dual-network failover where the station network is segmented
การติดตั้ง Wall, pole, ceiling-hung, canopy bracket, embedded in platform furniture, double-sided
โมดูล Touch, QR scanner, NFC / RFID reader, camera, intercom, emergency button, ambient-light sensor
การสร้างแบรนด์ Cabinet colour to operator identity, logo, boot screen, top signage, asset number plate

MOQ and lead time follow the configuration, not the catalogue. A pilot station is usually the fastest way to prove a specification before a line-wide order — confirm the pilot slot before the tender closes, not after award.

Procurement tool

Ten questions to send any transit display supplier

Copy this list into your RFQ. A supplier who answers all ten in writing, with documents, is a supplier who has delivered a hub project before. One who answers with adjectives has not.

  1. Which player, matrix or PIS software will drive the panel, and can you supply its EDID and timing profile before we approve the drawing?
  2. Which integration type are you quoting — video endpoint, network endpoint, or dual path with hardware override?
  3. What is the IP rating of the exact cabinet, and is there a test report for that cabinet rather than the product family?
  4. What impact and fire classification does the installed glass and material stack carry?
  5. What brightness do you commit to at the specified ambient light, viewing distance and worst-case sun angle?
  6. How is condensation controlled on an unheated elevated platform in your climate zone?
  7. Which CMS do you supply, does it accept GTFS-Realtime or a documented API, and who owns the licence after year three?
  8. How do you keep 40 stations on identical firmware and BOM for five years without a model change?
  9. What is the recommended spare-parts list, and what is the replacement lead time for a panel and for a driver board?
  10. Can we see a burn-in record and an IP report for the exact configuration before we issue the purchase order?

สิ่งที่ถามบ่อย

Questions we are asked at the quotation stage

Can a commercial-grade display be used for airport FIDS?

Mechanically yes, operationally no. FIDS runs 24/7 with a fixed layout for years, so the panel needs a duty rating, a stable backlight and a defined EDID path. A consumer panel will usually survive the first year and then drift in brightness or colour, which is visible when two banks sit side by side.

Does the display itself need to talk to AODB or the ATS?

No. The panel receives a rendered video signal (Type A) or content pushed by a CMS or PIS client (Type B). Data parsing, business rules and message priority live upstream. What the panel must do is accept that feed reliably and reproduce it without scaling artefacts.

What brightness is realistic for an elevated metro platform?

Most elevated platforms land between 1,000 and 1,500 nits with anti-glare glass. Below 1,000 nits, midday readability at 10 to 15 metres becomes a complaint in summer. Above 2,000 nits you start paying for thermal management and power that the site may not have.

Who handles multi-language, RTL and emergency content priority?

The player or the CMS. Font coverage, right-to-left layout and message priority are content-layer functions. The hardware contribution is character-safe rendering at the right resolution and a hardware override path when emergency content must beat the network.

Which certificates should I ask for before quotation?

Ask for CE and FCC scope, RoHS, ISO 9001, an IEC 60529 IP report for the exact cabinet, an IK report for the glass, and a safety-glass certificate. For trackside cabinets, ask the integrator for the EN 50121-4 position — that one is a system approval, not a panel certificate.

How do you keep dozens of stations on the same firmware and BOM?

By freezing the configuration at the drawing stage and versioning the firmware per project, not per shipment. Repeat orders reference the original project code, so a station added in year three ships as a match to year one rather than as the current catalogue item.

What about salt fog and coastal corrosion?

Specify ISO 9227 neutral salt-spray evidence and a stainless or correctly coated cabinet, then check the fastener and bracket material too. Corrosion failures in coastal stations are usually brackets and cable glands, not the display housing.

What is the minimum order for a pilot station?

A pilot unit is supported as a sample or pre-production unit, so a single station can be validated before a line-wide order. Confirm the pilot slot and the drawing approval date early: the pilot is usually the critical path, not the volume production.


Qtenboard

ขั้นตอนถัดไป

Send the station list. Get a configuration back.

We quote a hub project from a site schedule, not from a product code. Give us the items below and you will receive a preliminary BOM, an enclosure proposal and a pilot timeline — the drawing follows once the integration type is agreed.

  • Hub type and station or terminal count
  • Mounting positions and environment class per position
  • Data source and the owning platform or software vendor
  • Integration type — A, B or C — or "not yet decided"
  • Required size, brightness band and IP / IK target
  • Certificates your tender demands, and the authority that audits them
  • Target installation date and the pilot window

Talk to a project engineer

Configuration questions, drawing review and tender specification support. One working day for a first response on a complete brief.

อีเมล์ของคุณ Info@qtenboard.com โทรศัพท์สำหรับโทรศัพท์ +86 181 2471 3748 Based Longhua District, เซินเจิ้น, จีน, Since 2005 · OEM / ODM · CKD / SKD

Qtenboard is a China-based manufacturer of digital signage, kiosks, interactive flat panels and LCD video walls: three bases, 840,000 m² of total facility footprint and around 1,000 staff, exporting to more than 110 countries. Certification scope and commercial terms are confirmed per project.


Qtenboard Queenie Wang

ควีนนี่วัง

ซีอีโอ | ผู้เชี่ยวชาญด้านโซลูชันการแสดงผลแบบโต้ตอบและการทำงานร่วมกัน

ฉันเป็นผู้ก่อตั้ง qtenboard นำความเชี่ยวชาญด้านการลงมือปฏิบัติมากกว่า17ปีมาสู่อุตสาหกรรมการแสดงผลแบบสัมผัสจากมุมมองการจัดการทั่วโลกที่ได้รับจากการศึกษา EMBA ของฉันที่มหาวิทยาลัยเซินเจิ้นฉันนำทีมของฉันในการเพิ่มประสิทธิภาพทุกขั้นตอนของการดำเนินงานของเรา-จากความละเอียดของผลิตภัณฑ์ที่มีประสิทธิภาพสูงการจัดการห่วงโซ่อุปทาน-มั่นใจความสามารถในการผลิตของเรายังคงอยู่ในระดับแนวหน้าของอุตสาหกรรม

ในฐานะผู้นำของ qtenboard ฉันเชี่ยวชาญในการให้บริการโซลูชั่น oem/odm ที่ปรับแต่งสำหรับกระดานไวท์บอร์ดแบบโต้ตอบผนังวิดีโอ LCD ป้ายดิจิตอลและเทอร์มินัลสัมผัสระดับอุตสาหกรรมสนับสนุนโดย330,000ตารางเมตรสวนอุตสาหกรรมที่ทันสมัยของเราในเซินเจิ้น, เรารักษาเต็ม Lifecycle ควบคุมการออกแบบอุตสาหกรรม, การผลิตที่มีความแม่นยำ, และการทดสอบประสิทธิภาพที่เข้มงวด.

ด้วยประสบการณ์โครงการเกือบสองทศวรรษโซลูชันการแสดงผลของ qtenboard จึงถูกนำไปใช้ในกว่า120ประเทศและภูมิภาคได้รับความไว้วางใจจากลูกค้าระดับองค์กรมากกว่า15,000รายทั่วโลกหากคุณกำลังมองหาพันธมิตรที่ตอบสนองต่อการผลิตที่ลึกซึ้งสำหรับโครงการแสดงผลแบบสัมผัสที่กำหนดเองของคุณทีมของฉันและฉันพร้อมที่จะสนับสนุนวิสัยทัศน์ของคุณด้วยความเป็นเลิศระดับมืออาชีพ