From a single unit to fleet operations, plan the whole lifecycle
OPS modular design simplifies installation, maintenance and upgrades — but claims are kept to what has actually been verified.
Thermal adaptation
Module airflow path, heat structure and companion-device installation requirements are checked together with the display.
Project-level testing
Customer content playback, specified software, power-cycle loops and peripheral integration — the actual test scope is shown, not assumed.
Module swap procedure
Shutdown, power off, remove, install, driver check and function recovery — a documented step-by-step process.
Software recovery
Recovery image, driver package and configuration records, where provided as part of the delivery scope.
Spares & parts planning
Spare-unit recommendations and after-sales flow for multi-campus, multi-store and large-scale deployments.

EN
pt
spa
th
vie
aze
bel
est
lav
ukr
ru