IFP Supplier for Kyrgyzstan School Tenders — EDLA, EAC and a 3-Year Warranty
Choosing an IFP supplier Kyrgyzstan tender is not the same exercise as choosing a panel. A product page answers "what does it do". A tender file has to answer six different questions: is the technical specification brand-neutral and defensible, is every certificate real and model-level, does the EAC route have a lawful local applicant, will batches arrive before the school year, who holds the spare panel in year three, and which named contact closes a support ticket. This page sets out how Qtenboard supports that file as a school tender supplier — the bid pack, the documentation chain, the delivery and installation method, the local service structure and the entry points for each request. It also states plainly what EAC IFP compliance involves, because that is where the most expensive misunderstanding in this market happens.
The demand side is concrete. The draft 2027 republican budget in Kyrgyzstan includes a line of 536.9 million soms for interactive panels, alongside 954.5 million soms for laboratory equipment and 728.8 million soms for teacher laptops. The 2025 budget allocated 686 million soms for teacher laptops and 552 million soms for school repairs and procurement of goods. Those purchases run through Law No. 27 of 14 April 2022 "On Public Procurement" and the national portal, with a large amendment package taking effect on 1 January 2027: three procurement methods, three-year planning, mandatory market monitoring before announcement, beneficial-owner and no-affiliation disclosures, two-package evaluation, a bid-security cap of 2% and a performance-security cap of 10%. Donor-financed packages add World Bank STEP, Standard Procurement Documents and Anti-Corruption Guidelines. A supplier that cannot produce documents in all of those shapes is not ready, however good the display is.
Qtenboard publishes EDLA Interactive Whiteboard with Official Google EDLA, Secure Access, Long-Term Support, Certified Android and OEM / ODM Ready; 4K UHD ultra-HD display, 40–100 point infrared touch, sub-6 ms response time and a 3-Yr warranty; EDLA · ISO 9001 · CE · FCC with 3 Years Warranty Support; ROHS certified environmentally safe materials, FCC authorised wireless modules for US market compliance, ISO 9001 approved strict full-process quality control, Google EDLA Certified with Android Enterprise Device Compliance, EPEAT Gold certified eco-friendly electronic product standard and ENERGY STAR certified high-efficiency low-power performance; 2005 founding, 330,000 m² across three factories in China, around 1,000 skilled workers, exports to over 100 countries and more than 20 years as an OEM / ODM partner; in-house SMT, touch bonding, metal chassis production and 24-hour aging QC documented in the published factory video; the News guides on auditing an interactive whiteboard factory and on interactive flat panel ports and buttons; the Interactive Flat Panel Bid Control Solution, Digital Signage CMS Solution, Qtenboard 9679 IFP Solution, Wayfinding System Solution, Education Solution, Interactive Flat Panel Size Calculate Tool and Lcd Video Wall Size Calculate Tool; 180 Day Payment Terms; OEM / ODM / CKD / SKD; and a published Warranty Policy, contact page and multilingual site interface. All of that is manufacturer-side evidence. The local-applicant side of EAC is a separate legal step, described below.
Bid support capability: what a school tender supplier actually delivers
The technical volume is only one of five files. A bid that wins the evaluation and fails qualification never gets opened.
A capable school tender supplier does not send a catalogue and wait. It prepares, in parallel, a qualification folder that lets the bid be opened and a technical evidence folder that lets it be scored, then keeps both aligned with the sample, the delivered serial range and the acceptance acts. Qtenboard organises this through the Interactive Flat Panel Bid Control Solution: one controlled configuration linking the technical volume, the sample record, the compliance matrix and the delivered serial range. The point is not a document count; it is that the panel described in the offer, the panel demonstrated to the committee and the panel installed in the classroom are the same object. That single discipline is the practical difference between an IFP supplier Kyrgyzstan tender committees can audit and a reseller that only answers product questions.
Brand-neutral specification drafting
A functional floor written from the room record: diagonal from farthest-seat viewing distance, declared simultaneous writers, end-to-end ink latency, one-cable USB Type-C behaviour with the school's real laptop fleet, icon-only physical controls, an official EDLA licence gate, a frozen firmware baseline with a documented OTA and patch route, and a warranty period.
Standards are named by designation, no trademark or model code appears, and an or-equivalent clause accepts evidence from any bidder. This keeps the specification defensible under the openness and impartiality principles of Law No. 27.
Compliance matrix and indexed evidence
One row per requirement with the response, the measurement condition, the evidence document, the page number and the sample demonstration result. Unqualified adjectives, entitlement periods and "up to" maxima are moved to a remarks column rather than scored.
The same template is issued to both national-portal and donor packages, with a separate annex for World Bank Standard Procurement Documents, Anti-Corruption Guidelines acceptance and environmental, social, health and safety provisions.
Frozen sample and demonstration script
Model code, serial number, firmware version and checksum are recorded before any demonstration. One script is used for all bidders: Workspace sign-in, managed Play distribution, 4K decode, concurrent writing, port enumeration, eye-care and recording buttons, and an offline lesson pack.
A newer build on the demonstration table is recorded as a discrepancy, not accepted as an improvement.
Clarification-window response
From 1 January 2027, procuring organisations must conduct market monitoring and set a planned cost before announcing. That creates a legitimate early window for technical dialogue — provided identical information, identical questions and identical deadlines go to all potential bidders.
Supplied in that window: size-tool outputs, a room-survey template, a condition-first parameter sheet, a compliance-folder index and a draft acceptance table.
Priced three-year commercial file
One priced bill of materials with incoterms, duties and taxes shown separately; a three-year cost table carrying spares, replacement routes, training and management subscriptions; 180 Day Payment Terms written as milestones following accepted rooms rather than shipment dates.
Optional modules — cameras, microphone arrays, conferencing displays, digital signage and wayfinding — are priced as separate lines so the comparison stays like-for-like.
Training and handover material
Role-based teacher workshops, quick-start cards, an administrator handover pack and an asset register. Qtenboard publishes V100 Interactive Whiteboard Software Operation material and a multilingual site interface listing EN, spa, pt, vie, th, est, lav, aze, ukr, bel and ru; teaching-language cards for Kyrgyz, Russian and English are written as an authority deliverable.
Icon-only eye-care and recording buttons carry no translated legend, so they work in every language on that list without a separate build.
The bid calendar, from notice to acceptance
-
Before notice
Market monitoring and room record
The authority determines planned cost. Supplier-side input is limited to brand-free functional descriptions, size calculations and a room-survey template, distributed identically. School count, farthest-seat distance, maintained illuminance, teaching languages, offline needs and the real device fleet are filed by the school.
-
Notice published
Two folders prepared in parallel
Qualification folder: registration, tax, bank, experience, bid security, beneficial-owner and no-affiliation declarations. Technical evidence folder: compliance pack, model-level certificates, QC and aging records, firmware baseline and sample record. Supplier-side documents are indexed to the tender's clause numbers.
-
Clarification window
Identical questions, identical deadline
Exclusive-looking parameters are answered with a functional restatement plus equivalent evidence, not with a brand defence. Every clarification response is logged with its date and the clause it addresses.
-
Submission
Electronic bid on zakupki.gov.kg
Technical proposal, financial proposal, qualification package and bid security filed before the deadline with the required electronic signature. For donor packages, the same content is re-shaped into STEP or ADB document formats.
-
Evaluation
Frozen sample demonstration
From 2027, qualifications and technical proposals are assessed first, with the financial proposal opened only for those that pass and five business days between the stages. An abnormally low price can trigger a justification request with two business days to respond.
-
Award to acceptance
Serial chain closed per room
Contract, per-room acceptance acts, asset register, calibration sheets and QC records tied to one identifier. Complaints go first to the procuring organisation for electronic review within three business days, then to an independent commission formed by the Cabinet of Ministers.
Certificates and the document checklist — including EAC, stated honestly
A certificate checklist has three layers, and mixing them is what causes bids to fail at verification. Layer one is what the manufacturer actually publishes. Layer two is model-level evidence requested for the delivered configuration. Layer three is market access conformity that, under EAEU law, cannot be issued to a foreign manufacturer at all. Qtenboard supplies layers one and two; layer three is completed by a legally registered local applicant with manufacturer technical files supplied into it.
| Layer and document | Status on the published site | Who files it in the tender |
|---|---|---|
| Official Google EDLA / Certified Android | Published: EDLA Interactive Whiteboard, Official Google EDLA, Secure Access, Long-Term Support, OEM / ODM Ready | Manufacturer compliance pack, model-level certificate matched to the offered model code |
| EDLA · ISO 9001 · CE · FCC | Published on the homepage with 3 Years Warranty Support | Indexed evidence folder, one model code throughout |
| ROHS certified environmentally safe materials | Published in Certifications & Compliance | Evidence folder; also a source document for EAEU RoHS technical files |
| FCC authorised wireless modules | Published for US market compliance | Declare the actual wireless BOM; wireless modules can trigger additional EAEU equipment assessment |
| ISO 9001 approved full-process quality control | Published; factory video documents in-house SMT, touch bonding, metal chassis and 24-hour aging QC | QC chain, plus motherboard testing, touch calibration and spare-parts logistics from the factory-audit News guide |
| Android Enterprise Device Compliance | Published under Google EDLA Certified | Enrolment, managed Play distribution, OTA route and console-visible patch status per serial number |
| EPEAT Gold / ENERGY STAR | Published: eco-friendly electronic product standard and high-efficiency low-power performance | Evidence folder and the three-year operating-cost line |
| 3-Yr warranty and Warranty Policy | Published, with 3 Years Warranty Support | Service annex and priced spare-parts schedule |
| Model-level test reports | Requested for the delivered configuration: photobiological safety report, surface haze and gloss, layer stack, parallax, usable storage and a frozen firmware baseline | Requested from the manufacturer by model code and filed in the compliance matrix |
| QC / 24-hour aging / calibration records | Process published; unit-level records issued per delivered serial range | Serial-linked acceptance acts and asset register |
| Reading rule | A published badge, a model-level report and a market-access declaration are three different documents with three different issuers. | |
What EAC IFP compliance actually requires
Kyrgyzstan joined the Eurasian Economic Union in 2015, and EAC conformity became the mandatory route for regulated products across the five member states. For an interactive flat panel — a low-voltage electrical and IT device — the applicable technical regulations are TR CU 004/2011 on the safety of low-voltage equipment (AC 50–1000 V, DC 75–1500 V), TR CU 020/2011 on electromagnetic compatibility, and TR EAEU 037/2016 on the restriction of hazardous substances in electrical and radioelectronic products, mandatory since 1 March 2020. EAEU RoHS covers twelve product categories including electronic computers and connected devices, other electrical office equipment and information kiosks, with six restricted substances and a 0.1% limit, or 0.01% for cadmium.
The conformity form is decided by the technical regulation and the product's listing, not by preference. For display and IT equipment the common route is an EAC Declaration of Conformity registered in the EAEU unified register; TR EAEU 037/2016 provides for declarations only. Some products on a regulation's mandatory certification list require an EAC Certificate instead, and a device with Wi-Fi or Bluetooth modules can trigger additional radio-equipment assessment — which is why the actual wireless BOM must be declared rather than assumed.
Three parties, one file. The foreign manufacturer supplies evidence; the local applicant signs; the register makes the claim verifiable.
Verifying an EAC document before award
A PDF or a scanned cover is not verification. The EAEU unified register of issued certificates and registered declarations is checked for document status — valid, suspended or terminated — plus the registration number and date, validity period, applicant, manufacturer and production address, product name, model, trademark and TN VED EAEU code, the applicable technical regulations, the assessment scheme, the certification body and the laboratory. Coverage matters as much as status: a change of applicant, production address, trademark, model, key component, structure or software may require reassessment even while a document remains in force, and a single-batch declaration covers only the contract batch or quantity it names.
That verification step is also why the delivered BOM must be frozen. If a school programme buys 86-inch panels in 2026 and a second batch in 2027 with a different power board or wireless module, the earlier declaration may no longer describe the delivered goods. Qtenboard's OEM / ODM / CKD / SKD supply options and the Bid Control Solution exist to keep the model, BOM and firmware stable across those batches, so the EAC file, the calibration record and the asset register continue to describe the same product.
| Document group | Saturs | Issuer in the bid file |
|---|---|---|
| Technical bid | Functional response, condition-first parameter sheet, compliance matrix, size-tool outputs, room survey, demonstration script | Bidder with manufacturer technical input |
| Qualification bid | Registration, tax and Social Fund clearances, bank certificate, experience references, bid security, beneficial-owner and no-affiliation declarations | Local bidding entity |
| Manufacturer compliance | EDLA, ISO 9001, CE, FCC, ROHS, Android Enterprise Device Compliance, EPEAT Gold, ENERGY STAR, Warranty Policy, QC and 24-hour aging records | Qtenboard, model-level and serial-linked |
| EAEU market access | EAC Declaration of Conformity or, where the product listing requires it, an EAC Certificate; Russian-language technical passport, manuals and label artwork | EAEU-registered applicant or importer, with manufacturer technical files |
| Manufacturer authorisation | Authorisation letter naming the bidder, the model range, the territory and the period, tied to one legal entity | Qtenboard |
| Commercial bid | Priced BOM, three-year cost table, 180 Day Payment Terms by accepted rooms, incoterms, duties and taxes | Pretendents |
| Service annex | Spare-parts list, replaceable front-layer unit, escalation contact, patch cadence, teacher and administrator training plan | Bidder with manufacturer support |
| Rezultāts | Seven indexed groups, one model code, one declared BOM, one serial range. | |
- Keep the three certificate layers separate: published badge, model-level report, market-access declaration.
- Name the EAEU applicant before award: a foreign manufacturer cannot be the applicant or holder.
- Verify in the unified register: status, model, applicant, TN VED code and scheme.
- Declare the wireless BOM: radio modules can add an assessment route.
- Freeze the BOM across batches: otherwise an in-force declaration stops describing the goods.
- Never file CE as EAC: it is supporting evidence, not a substitute.
Delivery and installation: from a factory batch to an accepted classroom
Delivery in a school programme is a scheduling problem before it is a logistics problem. Republican budget lines follow the budget year and the academic calendar — equipment is expected before the start of the school year — while donor packages follow a procurement plan and a project closing date. Published teacher-laptop delivery in Kyrgyzstan arrived in successive tranches: 27,031 units in 2024, 20,286 in 2025 and 16,185 planned in 2026. Panels follow the same logic once a line is funded. A supplier has to be able to commit to batches, not to a single shipment.
-
Phase 1
Site survey and room schedule
Wall structure and load rating, rear ventilation clearance, power and network availability, window orientation, maintained 300–500 lux illuminance, seated eye height at the farthest chair, and teaching languages for quick cards. The Interactive Flat Panel Size Calculate Tool resolves each diagonal; the Lcd Video Wall Size Calculate Tool covers a tiled array where a lecture hall needs one.
-
Phase 2
BOM freeze and factory QC
Model code, glass and bonding stack, wireless BOM, firmware baseline and checksum frozen before production. Qtenboard's published factory video documents in-house SMT, touch bonding, metal chassis production and 24-hour aging QC; the factory-audit News guide names motherboard testing, touch calibration and spare-parts logistics as the three checks before an OEM contract.
-
Phase 3
Pre-labelling and batch dispatch
Units are labelled by school, building and room before dispatch, with serial numbers and firmware versions listed against the room schedule. OEM / ODM / CKD / SKD options keep subsequent batches on the same BOM, so a replacement in year three still matches the installed base.
-
Phase 4
Installation and per-room verification
Mount height and ventilation checked on site; USB 2.0/3.0, HDMI and Type-C enumerated with the school's real laptop fleet; eye-care and recording buttons verified; full-surface touch calibration; 4K test pattern and fine-text reading at the brightest teaching hour with the eye-care preset active.
-
Phase 5
Acceptance act, training and handover
One acceptance act per room ID: serial number, firmware, calibration sheet, QC and 24-hour aging records, compliance-folder index, and the demonstration result. Role-based teacher workshops and an administrator handover follow, then the asset register. 180 Day Payment Terms are written as milestones following accepted rooms or batches.
What a per-room acceptance act records
| Acceptance item | Observation on the delivered unit | Record filed |
|---|---|---|
| Diagonal and output | Diagonal derived from farthest seat; 4K UHD test pattern native, no scaling artefacts | Size Calculate Tool output and display test sheet |
| Touch and latency | Declared simultaneous writers with no stroke loss; 40–100 point infrared touch calibration; sub-6 ms end-to-end ink latency with app and firmware named | Calibration sheet and multi-user test record |
| Ports and controls | USB 2.0/3.0, HDMI and Type-C enumerated with the real laptop fleet; eye-care and recording buttons reachable and icon-only | Port enumeration and button test record |
| Visual conditions | Haze and gloss figures filed; dark-slide reading under the room's real fixtures at the brightest hour with eye-care active | Surface datasheet and room lighting survey |
| Platform state | Certified Android with EDLA sign-in, Workspace enrolment, managed Play distribution, OTA path and console-visible patch status per serial | Firmware baseline, checksum and console export |
| Offline content | Offline lesson pack loaded and usable with no network; quick cards delivered in Kyrgyz, Russian and English where required | Offline test record and language sign-off |
| Evidence chain | Compliance folder, manufacturer authorisation, EAC document reference where the delivered goods are covered, QC and aging records, warranty registration | Indexed folder, one model code and one serial range |
| Commercial milestone | Room accepted, act signed, asset registered; 180 Day Payment Terms applied per accepted batch | Acceptance act and milestone schedule |
| Rezultāts | Every delivered room closes the loop from offer to evidence to payment. | |
The installation section is also where a school tender supplier earns the three-year warranty claim. A recessed cabinet that restricts rear clearance can raise steady-state temperature even for a unit that passed 24-hour aging QC at the factory; a wall that was never surveyed can put the farthest seat outside the calculated viewing distance. Both show up later as "the panel is dim" or "the pen is inaccurate" tickets that have nothing to do with the panel. Recording the survey, the clearance and the luminaire positions in the same folder as the calibration sheet is what turns those complaints into solvable service calls.
Local service: the legal entity, the spare panel and the escalation contact
Local service in a Kyrgyzstan tender has three distinct meanings, and a bid that answers only one of them will be queried. First, a legal presence: the applicant for EAC conformity, the holder of the authorisation letter and the entity that can sign a contract and accept a bank guarantee in the local system. Second, a physical service capability: spares, replacement units, installation teams and a swap route. Third, a remote management capability: firmware, patches, enrolment and console visibility per serial number. Qtenboard supports the second and third from the manufacturer side; the first is established by the appointed local bidding entity or authorised representative.
| Service dimension | What the manufacturer supplies | What the local party owns | What the tender must state |
|---|---|---|---|
| Legal and authorisation chain | Manufacturer authorisation letter naming the bidder, model range, territory and period; company registration and compliance pack | Local legal entity, portal registration, electronic signature, bank guarantee or bid security, tax and Social Fund clearances | One legal entity from the authorisation letter to the acceptance act |
| EAC applicant | Technical passport, test reports, Russian-language manuals, BOM, label artwork, unit-level QC records | EAEU-registered applicant holding the EAC Declaration, with its address and contacts in the register | The applicant name, document number and registration date as verifiable fields |
| Spares and replacement | Spare-parts list, same-batch matching rule, replaceable front-layer unit, OEM / ODM / CKD / SKD continuity | Local stock location, customs clearance, swap team and a rehearsed replacement at commissioning | Named replaceable unit, maximum downtime per incident and swap time |
| Tālvadības vadība | Certified Android with EDLA, a frozen firmware baseline, OTA and security-patch route, Android Enterprise Device Compliance, managed Play distribution | Console access, enrolment records, policy push, remote app distribution and wipe | Patch cadence, console-visible version per serial number and an escalation contact |
| Garantija | 3-Yr warranty, 3 Years Warranty Support, Warranty Policy, QC and 24-hour aging records | Warranty registration, ticket intake, first-line triage and annual review | Warranty period, start date per acceptance act and what is excluded |
| Training and language | V100 software operation material, multilingual site interface, icon-only physical controls | Teacher workshops, administrator handover, Kyrgyz / Russian / English quick cards | Role-based training plan and language sign-off |
| Response commitments | Escalation contact and firmware or update contact | Response and resolution targets, staffed hours, ticket categories | Identical clarification questions to all bidders, with the answer in the service annex |
| Reading rule | A service claim is only as good as the entity named beside it and the evidence filed under it. | ||
What is published, and what is a clarification item
Qtenboard publishes a 3-Yr warranty with 3 Years Warranty Support and a Warranty Policy, 180 Day Payment Terms, OEM / ODM / CKD / SKD supply, and a named manufacturer-side contact path. It does not publish a network of Kyrgyz service centres, a response-time guarantee in hours, a local spare-parts inventory count or a named EAEU authorised representative. Those figures are configuration- and contract-dependent, so they belong in the service annex supplied by the bidding entity, with identical questions and identical deadlines for every bidder. Writing a specific hour count into an article would be a claim no one could verify at evaluation; writing the requirement into the annex makes it enforceable.
The same discipline applies to the EAEU bank guarantee. The EAEU Agreement on Mutual Recognition of Bank Guarantees in public procurement, together with EEC Council Decision No. 87 of 29 August 2023, provides a route for recognising guarantees issued by banks in another member state, with finance ministries designated as the authorised bodies in Armenia, Kazakhstan, Kyrgyzstan and Russia. Contracting authorities still commonly prefer guarantees from local or internationally known banks, so the accepted issuer is confirmed in the tender documentation rather than assumed. Under the 2027 rules, bid security is capped at 2% of planned value, performance security at 10%, and deposits are returned within seven business days after obligations are fulfilled.
| Pirms | Pēc |
|---|---|
| "Local service available" stated without an entity | Legal entity, EAC applicant, authorisation holder and escalation contact named in one annex |
| CE and FCC reports filed as EAC evidence | Supporting technical files plus a registered EAC declaration held by the local applicant |
| A single shipment treated as the whole delivery | Batch schedule pre-labelled by school and room, with a frozen BOM across tranches |
| Warranty described only as a period | 3-Yr warranty, Warranty Policy, replaceable unit, swap rehearsal and annual review |
| Response hours quoted without evidence | Response commitments written into the service annex with identical clarification questions |
| Sample, offer and delivered unit drifting apart | Model code, serial range, firmware baseline, checksum and calibration sheet on one chain |
Contact entry points and the request each one handles
A tender file moves faster when the first message goes to the right queue. Choosing an IFP supplier Kyrgyzstan tender also means knowing who answers a certificate question, who freezes a sample and who signs a service annex. The published Qtenboard contact paths below are manufacturer-side entries; local bidding, EAC registration and on-site service are handled by the appointed local entity named in the bid. Each entry maps to a concrete deliverable so the request is answerable in one pass rather than in a chain of forwards.
Compliance pack and bid documentation
Request the indexed model-level certificate folder, EDLA evidence, product datasheets, condition-first parameter sheet, compliance-matrix template and factory-audit material.
Sample, batch schedule and commercial terms
Request a frozen sample configuration, a batch plan aligned to the academic calendar, a priced bill of materials and 180 Day Payment Terms by accepted rooms.
Pārdošanas vadītājs: +86 18124713748
Quick technical questions
WeChat and WhatsApp mail inquiry use the published sales contact for short clarifications on model codes, ports, sizes and software operation. Attach the tender clause number so the reply can be filed in the clarification log.
WeChat: +86 18124713748 · Whatsapp Mail Inquiry on the site
On-site message form and site address
The site's Message / Submit form covers general enquiries; the published factory address is used for factory-audit visits, sample collection and OEM / ODM contract discussions.
Building A, No. 3, North District, Shangxue Science and Technology City, Xinxue Community, Bantian Street, Longgang District, Shenzhen
| What you need | Ask for | Where it lands in the bid |
|---|---|---|
| Model-level certificates | EDLA, ISO 9001, CE, FCC, ROHS, Android Enterprise Device Compliance, EPEAT Gold, ENERGY STAR, Warranty Policy | Manufacturer compliance folder, indexed to clause numbers |
| EAC technical file | Technical passport, BOM, circuit diagrams, existing test reports, Russian-language manual and label artwork, QC records | Handed to the EAEU-registered applicant; not filed as a factory-held EAC certificate |
| Factory evidence | 24-hour aging QC, motherboard testing, touch calibration, spare-parts logistics, in-house SMT and touch bonding records | Technical evidence folder and serial-linked acceptance acts |
| Brand-free specification | Room-survey template, size-tool outputs, functional floor and or-equivalent clause | Technical volume and clarification log |
| Paraugs | Frozen model code, serial number, firmware version, checksum and one demonstration script | Sample record and compliance matrix |
| Cenas | Priced BOM, three-year cost table, 180 Day Payment Terms, OEM / ODM / CKD / SKD options | Commercial bid and service annex |
| After award | Firmware baseline, patch cadence, escalation contact, spare module and annual review template | Administrator handover and asset register |
| Rezultāts | One request, one deliverable, one folder — no document hunting during the clarification window. | |
Biežāk uzdotie jautājumi
These are the questions usually raised by procurement committees, distributors and school IT teams evaluating an IFP supplier Kyrgyzstan tender, comparing a school tender supplier on documentation and service, or clarifying what EAC IFP compliance requires in the EAEU.
What does Qtenboard actually supply to a Kyrgyzstan school tender?
Manufacturer-side evidence and technical support: a brand-neutral functional specification draft, an indexed compliance pack, model-level test reports, QC and 24-hour aging records, a frozen sample configuration, a priced bill of materials, OEM / ODM / CKD / SKD supply continuity, teacher and administrator training material, a three-year warranty and 180 Day Payment Terms. Local bidding, EAC registration, installation teams and on-site spares are owned by the appointed local entity.
Does Qtenboard hold an EAC certificate?
No EAC certificate is listed on the published compliance panel. Qtenboard publishes EDLA, ISO 9001, CE, FCC, ROHS, FCC authorised wireless modules, Android Enterprise Device Compliance, EPEAT Gold and ENERGY STAR. Under EAEU rules a foreign manufacturer cannot be the applicant or holder of an EAC declaration; that role belongs to an entity registered in a member state. Qtenboard supplies the technical passport, test reports, BOM, Russian-language manuals, label artwork and unit-level QC records into that local filing.
Which EAEU technical regulations apply to an interactive flat panel?
TR CU 004/2011 on low-voltage equipment safety (AC 50–1000 V, DC 75–1500 V), TR CU 020/2011 on electromagnetic compatibility, and TR EAEU 037/2016 on the restriction of hazardous substances in electrical and radioelectronic products, mandatory since 1 March 2020. EAEU RoHS covers twelve categories including computers and connected devices, other electrical office equipment and information kiosks, with six restricted substances limited to 0.1%, or 0.01% for cadmium.
EAC Declaration or EAC Certificate — which one is needed?
The technical regulation and the product's listing decide, not the supplier's preference. Display and IT equipment commonly follows the EAC Declaration of Conformity route registered in the EAEU unified register; TR EAEU 037/2016 provides for declarations only. Products on a regulation's mandatory certification list require an EAC Certificate. A device with Wi-Fi or Bluetooth modules can also trigger additional radio-equipment assessment, so the real wireless BOM must be declared.
Can CE and FCC reports be used instead of EAC?
No. EAEU law does not recognise CE as a mutual-equivalence route. CE and FCC reports may be accepted as supporting technical evidence, but EAEU-accredited testing where required and registration in the unified register are still necessary. Filing a CE report as an EAC document is one of the most common verification failures in this market.
Who is the applicant for the EAC declaration?
A legal entity registered inside the EAEU — an importer or an authorised representative acting under a notarised agreement with the manufacturer. Its name, address and contact details appear on the declaration and it carries legal responsibility for conformity. A Chinese manufacturer cannot apply directly or hold the document in its own name.
How do we verify an EAC document before award?
Check the EAEU unified register of issued certificates and registered declarations: status (valid, suspended or terminated), number and registration date, validity period, applicant, manufacturer and production address, product name, model, trademark, TN VED EAEU code, applicable technical regulations, assessment scheme, certification body and laboratory. A scanned PDF alone is not verification. Also check that the model and BOM on the register match the delivered goods.
Does one EAC document cover all five member states?
In principle, an EAEU technical regulation document applies across the union, including Kyrgyzstan, which joined in 2015. National requirements can still apply in areas such as radio equipment, metrology or sanitary rules. A single-batch declaration covers only the contract batch or quantity it names, so a phased school programme needs its document scope checked batch by batch.
What if a later batch changes the power board or wireless module?
A change of applicant, production address, trademark, model, key component, structure or software may require reassessment even while a document remains in force. That is why the BOM and firmware baseline are frozen before production and retained across batches through OEM / ODM / CKD / SKD supply and the Interactive Flat Panel Bid Control Solution. Otherwise an in-force declaration stops describing the delivered goods.
What bid documents should be ready on the day the notice is published?
Seven indexed groups: technical bid, qualification bid, manufacturer compliance, EAEU market access, manufacturer authorisation, commercial bid and service annex. The qualification folder gets the bid opened; the technical evidence folder gets it scored. Keeping them separate prevents a tax certificate from being treated as proof of classroom readability.
What is in the qualification folder on zakupki.gov.kg?
Portal registration and a Kyrgyz electronic signature, registration or re-registration certificate, TIN, charter or founding documents, no tax and no social insurance arrears, a bank certificate, experience references, a technical and a financial proposal, and bid security. Under the 2027 rules, beneficial-owner information and a written no-affiliation declaration are also required, bid security is capped at 2% and performance security at 10%.
What changes in Kyrgyzstan public procurement on 1 January 2027?
Three procurement methods — open, request for quotations and single-source; three-year planning based on needs, inventory and strategic plans; mandatory market monitoring before announcement; randomly selected committees with at least three members; two-package evaluation with five business days before price opening; complaints first to the procuring organisation within three business days; bid security capped at 2%, performance security at 10% and deposits returned within seven business days; and portal records retained for at least ten years.
How are deliveries scheduled around the school year?
Republican budget lines follow the academic calendar, with equipment expected before the start of the school year; donor packages follow a procurement plan and closing date. Batches are pre-labelled by school, building and room, with serial numbers and firmware versions on the room schedule, and 180 Day Payment Terms written as milestones following signed per-room acceptance acts rather than shipment dates.
What does a per-room acceptance act contain?
Room ID, serial number, firmware baseline and checksum, calibration sheet, port enumeration, 4K test pattern and fine-text reading, dark-slide reading at the brightest teaching hour with the eye-care preset active, offline lesson pack test, language sign-off, compliance-folder index, QC and 24-hour aging records, and warranty registration. It is the document that closes both the evidence chain and the payment milestone.
What does the three-year warranty actually cover in a bid file?
Qtenboard publishes a 3-Yr warranty with 3 Years Warranty Support and a Warranty Policy. The tender annex should add the warranty start date per acceptance act, the named replaceable front-layer unit, a same-batch matching rule, a rehearsed swap time, the maximum acceptable downtime and the escalation contact. A period without those lines is a marketing statement rather than a service commitment.
Does Qtenboard publish local service centres or response times in Kyrgyzstan?
No. The site publishes manufacturer-side contact paths, a warranty, supply options and a factory QC process, but not a local service-centre network, an hourly response guarantee or a spare-parts inventory count. Those commitments belong in the service annex supplied by the bidding entity, with identical clarification questions issued to all bidders so they can be evaluated and enforced.
Can a bank guarantee from another EAEU country be used?
The EAEU Agreement on Mutual Recognition of Bank Guarantees in public procurement and EEC Council Decision No. 87 of 29 August 2023 provide a recognition mechanism, with finance ministries as the authorised bodies in Armenia, Kazakhstan, Kyrgyzstan and Russia. Contracting authorities still commonly prefer local or internationally known banks, so the accepted issuer is confirmed in the tender documentation.
How do donor-financed packages differ from national portal tenders?
World Bank Investment Project Financing uses STEP for procurement plans and transactions, with the Bank's Standard Procurement Documents for internationally competitive contracts, a signed acceptance of the Anti-Corruption Guidelines including sanction, inspection and audit rights, ESHS provisions and no preference for goods and works. ADB packages run through the ministry's project implementation unit under ADB guidelines. Prepare a separate evidence shape for each.
How do we start a request?
Email info@qtenboard.com for the indexed compliance pack, model-level certificates, condition-first parameter sheet and factory-audit material; use the published sales contact for a frozen sample, batch schedule and priced bill of materials; and include the tender clause number so the reply can be filed directly in the clarification log. Local bidding, EAC registration and on-site service then sit with the appointed local entity named in the bid.
Preparing an IFP bid for a Kyrgyzstan school programme?
Qtenboard supplies EDLA-certified interactive whiteboards with 4K UHD output, 40–100 point infrared touch, sub-6 ms response, model-level compliance documentation, QC and 24-hour aging records, a three-year warranty, 180 Day Payment Terms and OEM / ODM / CKD / SKD options from its Shenzhen manufacturing base. Request the compliance pack, EAC technical file checklist and bid documentation.

EN
spa
pt
vie
th
est
lav
aze
ukr
bel
ru