School Interactive Panel Procurement Checklist: 18 Points That Survive an Audit
School panel tenders rarely fail because a screen was bad. They fail because nobody wrote down how many rooms there are, who owns year three, what happens when a tile of glass breaks in February, or which document proves the delivered unit is the one that was demonstrated. This school interactive panel procurement checklist turns those questions into eighteen verifiable items, grouped into six decisions every school procurement file has to make: quantified demand, technical floors, certification and warranty, local service, payment and acceptance, and training with handover. Each item states what to write, what evidence to file and which selection criteria it satisfies. Qtenboard supplies the panel, the compliance pack, the factory records and factory-direct documentation; the school retains the room schedule, the accounts, the timetable and the final sign-off.
The eighteen points are deliberately split between gates and scored items. A gate is binary — official Google EDLA certification for the delivered model, a three-year warranty, a named escalation contact — and cannot be traded against a lower unit price. A scored item is measurable and comparable — simultaneous touch points demonstrated on the sample, farthest-seat legibility, a documented update route, a training plan with named roles. Committees that mix the two end up arguing about a yes/no field as if it were a gradient, and that is where a bid protest usually starts. The checklist below keeps them in separate columns so the evaluation sheet writes itself.
Product and company references follow Qtenboard's published material: EDLA Interactive Whiteboard with Official Google EDLA, Secure Access, Long-Term Support, Certified Android and OEM / ODM Ready; Interactive Whiteboard for Education and for Business; Interactive Table; LCD Video Wall for Retail, for CCTV and for Education; Indoor, Outdoor, OLED and LED Digital Signage; Payment, Queue and Info Kiosks; Industrial touch panel PC; Stand By Me TV; Desktop POS Terminal; the Interactive Flat Panel Bid Control Solution, Digital Signage CMS Solution, Qtenboard 9679 IFP Solution, Wayfinding System Solution, Education Solution, Interactive Flat Panel Size Calculate Tool and LCD Video Wall Size Calculate Tool; 4K UHD ultra-HD display, 40–100 point infrared touch, sub-6 ms response time and a three-year warranty; EDLA · ISO 9001 · CE · FCC with 3 Years Warranty Support; OEM / ODM / CKD / SKD; 180 Day Payment Terms; ROHS certified environmentally safe materials, FCC authorised wireless modules for US market compliance, ISO 9001 approved strict full-process quality control, Google EDLA Certified with Android Enterprise Device Compliance, EPEAT Gold certified eco-friendly electronic product standard and ENERGY STAR certified high-efficiency low-power performance; 2005 founding, 330,000 m² across three factories in China, around 1,000 skilled workers, exports to more than 100 countries and over 20 years of global trade as an OEM / ODM partner; in-house SMT, touch bonding, metal chassis production and 24-hour aging QC documented in the published factory video; the V100 Interactive Whiteboard Software Operation material; the News guides on auditing an interactive whiteboard factory and on interactive flat panel ports and buttons; and the published contact, warranty policy and multilingual site interface.
How to use the 18 points
Six groups, three items each. Every item ends with an evidence line — the exact document a reviewer should be able to open without contacting the vendor.
Write the room first
Points 01–03 quantify demand before any product is named. A specification that starts with a diagonal instead of a room schedule has already skipped the three cheapest mistakes to avoid.
Separate gates from scores
Points 04–09 contain the binary gates: a technical floor, licensed platform evidence and a compliance pack. Points 10–18 are measurable commitments that can be compared.
Close the serial chain
The last item in every group resolves to a document tied to a serial number. If a claim cannot be filed against a delivered unit, it is not an acceptance item yet.
Quantify demand
Rooms, learners and curriculum. Output: a room schedule Ja a workload profile, both signed before the technical volume is drafted.
Technical floors
Display, platform and ports. Output: a pass/fail floor with a demonstration script for the sample unit.
Certification & warranty
Compliance pack, warranty statement and factory QC. Output: one model-level evidence folder.
Kohalik teenistus
Named entity, spares and escalation. Output: a signed service annex with covered cities and an update route.
Payment & acceptance
Terms, per-room acceptance and a frozen sample. Output: acceptance acts linked to payment milestones.
Training & handover
Teacher workshops, admin handover and the annual review. Output: an operations folder the school can run without the vendor.
A worked example, written as the school would file it
A two-building secondary school runs 24 teaching rooms: 18 standard classrooms, four seminar rooms, one lecture room and one satellite site. Average occupancy is 32 learners; the lecture room holds 96. Teaching runs in three languages, with cached offline lesson packs for the satellite building where bandwidth is intermittent. The room schedule therefore records 24 positions, three room types, one longest viewing distance, one offline site and one required number of simultaneous writers per room type. The Interactive Flat Panel Size Calculate Tool resolves the diagonal from the farthest seat; the lecture room is handled as an IFP plus a side commercial display panel rather than as an oversized single surface. That single sheet of paper decides points 01, 02, 03, 04 and 16 before a price is discussed, and it is the first document the evaluation committee asks to see.
Notice what the example does not contain: a brand name, a bid price or a delivery date. Those come later, and they are compared against a room schedule that already exists. A school procurement file built in this order is also much easier to defend, because every later clause can be traced back to a measured condition rather than to a preference.
Points 01–06: demand and the technical floor
These six items turn a vague request into a specification. The first three are owned by the school; the second three are owned by the bidder and verified on a sample unit. Keep that ownership line visible in the compliance matrix — it prevents the common failure where a vendor is asked to guess how many classrooms a district has.
Room and class count Gate
Record every teaching position by building, floor, room type and shared-use status, plus a stated spare allowance and the rooms that will be added in the next phase. Separate standard classrooms from seminar, lecture and satellite spaces, because they do not share one diagonal or one mount height. State the batch structure so the supplier can freeze a BOM rather than re-quote each delivery.
Learners per room and farthest-seat geometry Gate
For each room type, record seated capacity, the distance from the teaching wall to the farthest chair, seated eye height, window orientation and the smallest text a student must read. Run the Interactive Flat Panel Size Calculate Tool from that distance; for a tiled teaching wall use the LCD Video Wall Size Calculate Tool. Where one surface cannot resolve the back row, specify an IFP plus a side commercial display panel instead of simply buying a larger diagonal.
Curriculum and workload profile
Describe what actually runs in the room: how many students write at once, which 4K sources are used, whether conferencing clients are active, whether offline lesson packs are required, and which teaching languages the interface and quick cards must cover. Qtenboard's site publishes EN, spa, pt, vie, th, est, lav, aze, ukr, bel and ru interfaces; where a school needs an additional language, the quick-card and content layer is specified as an authority deliverable rather than assumed as a firmware locale. The profile also fixes the CMS preset map and the offline sync behaviour for low-bandwidth sites.
Display and touch floor Gate
Write the published floor as a pass/fail line: 4K UHD ultra-HD output, 40–100 point infrared touch, sub-6 ms response time. Then require the sample demonstration to exercise the declared concurrency — continuous handwriting, palm rejection, erasing and a full-surface calibration — rather than accepting a datasheet maximum. Qtenboard publishes these four figures on its homepage, so the clause can be checked against a public source as well as against the offered unit.
Platform, identity and update floor Gate
Require Official Google EDLA certification for the delivered model, Secure Access, Long-Term Support and Certified Android, with Google EDLA Certified / Android Enterprise Device Compliance evidence. Licensed GMS must be system-level — Play, Play Protect, Drive, Meet and Classroom under institutional sign-in — not a sideloaded package or a browser shortcut. Enrol the sample in Android Enterprise, push a managed Play allowlist, disable unknown sources and demonstrate a remote policy change. Freeze the firmware baseline at acceptance and require a documented OTA and patch route with version status visible in the console.
Ports, physical controls and the real laptop fleet
Qtenboard's published News guide on interactive flat panel ports and buttons makes the usability case directly: USB 2.0/3.0, HDMI and Type-C define connectivity, while physical eye-care and recording buttons put the two most-used functions one press away. Specify that every port enumerates with the school's actual devices under load, that touch-back survives a Type-C link while a 4K source plays, and that the buttons are icon-only so they work in every teaching language without a translated legend. Add the anti-glare surface, an eye-care preset and the smallest-text reading from the back row as acceptance items.
Points 07–12: compliance, warranty and local service
These six items are the ones most often reduced to a photocopied certificate. They are also the ones that decide whether a school can answer an audit two years later. The rule is simple: the evidence folder and the delivered serial range must describe the same configuration.
Compliance pack, model-level Gate
Require a single folder containing the model-level EDLA evidence, EDLA · ISO 9001 · CE · FCC documentation, ROHS certified environmentally safe materials, FCC authorised wireless modules for US market compliance, ISO 9001 approved strict full-process quality control, Google EDLA Certified with Android Enterprise Device Compliance, EPEAT Gold certified eco-friendly electronic product standard and ENERGY STAR certified high-efficiency low-power performance. Every document names the same legal entity and the same model code as the offer, the price schedule and the authorisation letter. A family-level document is not proof for a specific diagonal.
Three-year warranty statement Gate
Qtenboard publishes 3-Yr Warranty and "EDLA · ISO9001 · CE · FCC · 3 Years Warranty Support" on its homepage, together with a published Warranty Policy. The tender should require one warranty period across the technical volume, the price schedule, the authorisation letter and the warranty statement — an internal contradiction here is one of the most common recorded deviations. State what the warranty covers, what the replacement route is, and how a claim is opened with a serial number rather than a room name.
Factory QC and aging records
The published factory video documents a 330,000 m² Shenzhen display manufacturing facility with in-house SMT, touch bonding, metal chassis production and 24-hour aging QC. The News guide on auditing an interactive whiteboard factory names motherboard testing, touch calibration and spare-parts logistics as the checks before an OEM contract. Require those records per delivered serial number, plus the sample identifier and the firmware version. A unit that arrives at a school should already have spent a day at load, and the school should be able to prove it.
Named legal entity and authorisation Gate
Require a Manufacturer's Authorisation Letter and a qualification file that resolve to one legal entity through the whole chain: certificate holder, manufacturer, bidder and the party that signs the service annex. Qtenboard publishes its sales contact, Shenzhen address, team and company pages, plus an OEM / ODM partner model; where a regional distributor is involved, name it and attach its authorisation. Do not accept "local partner to be confirmed" as a service commitment.
Spare parts and replacement logistics
Spare-parts logistics is one of the three checks named in Qtenboard's factory-audit guide, and it belongs in the contract rather than in a sales conversation. Specify the spare list, the same-batch or same-model matching rule, where replacements are held, who opens a claim and the maximum acceptable teaching-hours loss. For a phased programme, OEM / ODM / CKD / SKD supply keeps later batches on the same BOM, so a panel replaced in year three still matches the fleet's glass, firmware and calibration records.
Escalation, updates and console visibility
Name the escalation contact for firmware, patch and certification questions and file it with the compliance folder. Qtenboard's published contact details — the sales manager line, info@qtenboard.com and the Longgang District, Shenzhen address — are the manufacturer-side route; the authority-side route is the IT desk that owns the admin console. Require a defined patch review interval, planned change windows outside exam periods, and firmware, patch level and last check-in visible per serial number. Ten units should be auditable without walking the building.
One caution belongs with point 07. Where a school also requires photobiological safety evidence such as an IEC 62471 test report, that is requested as a model-level laboratory document for the delivered configuration and filed in the same folder; the published Certifications & Compliance panel lists the seven documents above and does not present that report as a standing badge. Asking for the right document, in the right folder, is more useful than adding a logo to a datasheet.
Points 13–18: payment, acceptance, training and handover
The last six items are where a good technical bid becomes a working school estate. They also protect the supplier: every milestone has a document, so there is no argument at year two about which configuration was actually delivered.
180 Day Payment Terms tied to accepted rooms Gate
Qtenboard publishes 180 Day Payment Terms. Write them into the contract as milestones that follow acceptance of delivered batches rather than shipment dates: a defined portion on the signed compliance folder, a portion on each accepted room or batch, and the balance on final handover. That lets the authority evaluate lifecycle behaviour before the final milestone, and it gives the supplier a predictable schedule. State the incoterms, duties and taxes separately so the price comparison is like-for-like.
Per-room acceptance act Gate
One act per room, signed against a serial number: 4K output, touch calibration across the full surface, port enumeration, physical buttons, enrolled account, firmware version, eye-care preset and the farthest-seat reading at the brightest hour. Attach the QC and 24-hour aging records and the asset register row. A single "project complete" certificate at the end is not an acceptance process; it is a summary with no way to reproduce an individual complaint.
Frozen sample and the compliance matrix
The Interactive Flat Panel Bid Control Solution exists for exactly this: one controlled configuration, documented and repeatable, so the technical volume, the sample record and the delivered rooms describe the same device. Before any demonstration, record the sample's model code, serial number, firmware version and checksum. A newer build on the demo table is a discrepancy, not an improvement, because the committee would be evaluating a product that will not be delivered. Every claim then resolves to a matrix row: requirement, response, technical answer, and the exact document and page proving it.
Role-based teacher workshops
Short sessions built around real tasks, not a product tour: open a Drive lesson, annotate and save, start a Meet session, switch input, use the eye-care and recording buttons, and recover from a disconnected cable. Issue quick cards in the school's teaching languages and keep the icon-only physical controls as the common reference. Qtenboard publishes EN, spa, pt, vie, th, est, lav, aze, ukr, bel and ru interfaces and V100 Interactive Whiteboard Software Operation material; the school owns the local-language card set and the timetable. Record attendance by role, not just by headcount.
Admin handover Gate
Hand over the console, the asset register, the firmware baseline, the managed Play allowlist, the CMS preset map, the compliance folder, the warranty policy, the spare-parts list and the escalation contact as one indexed set. Demonstrate remote app distribution, a policy push, a managed wipe at decommissioning and the patch-status export. The test of a good handover is that the IT desk can answer "which build is in room 14, and who do I call about it" without contacting the vendor.
Annual review and decommissioning
Close the loop at the end of each school year: export firmware, patch level and last check-in for the fleet; re-verify certificate validity, warranty status, spare inventory and the escalation contact; repeat the sample bench after any OTA that changes the graphics, scheduling or backlight stack. Write the end-of-service behaviour now — remote policy removal, managed wipe, account revocation and asset-register closure — so a panel leaving service does not leave credentials or cached lesson content behind.
-
Before tender
Points 01–03
Academic affairs and facilities sign the room schedule, workload profile and size calculations. No product name appears yet.
-
Spetsifikatsioon
Points 04–12
Gates and scored items are separated. The compliance folder template, service annex and payment schedule are issued with identical wording to every bidder.
-
Evaluation
Point 15
Sample model, serial, firmware and checksum are frozen before demonstration; the compliance matrix is scored row by row.
-
Kohaletoimetamine
Points 13–14
Batches are accepted room by room, each act tied to a serial number, and payment milestones follow those acts under the 180 Day Payment Terms.
-
Operatsioon
Points 16–18
Teacher workshops, admin handover and the annual review move ownership to the school; the vendor remains the escalation route.
The 18-point master checklist
This is the page to print. Each row names the item, whether it is a gate or a scored commitment, and the single document that closes it. A reviewer should be able to tick all eighteen without opening an email thread.
| # · Item | Group | Tüüp | Closing document |
|---|---|---|---|
| 01 · Room and class count | Demand | Gate | Signed room schedule with room IDs, phases and spare count |
| 02 · Learners and farthest-seat geometry | Demand | Gate | Size Calculate Tool output and farthest-seat reading |
| 03 · Curriculum and workload profile | Demand | Scored | Workload profile signed by academic affairs |
| 04 · Display and touch floor | Tehniline kohta | Gate | Datasheet, calibration sheet and multi-user writing test |
| 05 · Platform, identity and update floor | Tehniline kohta | Gate | Model-level EDLA certificate, enrolment record, OTA route |
| 06 · Ports, controls and real devices | Tehniline kohta | Scored | Port enumeration sheet and button test record |
| 07 · Model-level compliance pack | Sertifitseerimine | Gate | Indexed compliance folder, one model code throughout |
| 08 · Three-year warranty statement | Sertifitseerimine | Gate | Warranty Policy and consistent period in all bid volumes |
| 09 · Factory QC and aging records | Sertifitseerimine | Scored | QC, 24-hour aging, motherboard test and calibration sheets |
| 10 · Named entity and authorisation | Service | Gate | Authorisation Letter and qualification file, matching legal names |
| 11 · Spares and replacement logistics | Service | Scored | Spare list, BOM revision rule and swap rehearsal record |
| 12 · Escalation, updates, console visibility | Service | Scored | Contact sheet, patch cadence, test patch and console export |
| 13 · 180 Day Payment Terms by acceptance | Maksed | Gate | Milestone schedule linked to acceptance acts |
| 14 · Per-room acceptance act | Maksed | Gate | Signed act per room ID with serial and firmware version |
| 15 · Frozen sample and compliance matrix | Maksed | Scored | Sample list with checksum and clause-by-clause matrix |
| 16 · Role-based teacher workshops | Koolitus | Scored | Attendance by role, quick cards and five-task sign-off |
| 17 · Admin handover | Koolitus | Gate | Handover index, console access and policy-push demonstration |
| 18 · Annual review and decommissioning | Koolitus | Scored | Annual review report, post-OTA re-check and wipe log |
| Tulemus | 18 ticks, one evidence folder, one serial chain, one three-year owner | ||
Gates versus scored items
| Evaluation treatment | Items | How it is written |
|---|---|---|
| Mandatory pass/fail gate | 01, 02, 04, 05, 07, 08, 10, 13, 14, 17 | "Complies / does not comply" with an attached document. A lower unit price cannot trade these away. |
| Scored, demonstrable commitment | 03, 06, 09, 11, 12, 15, 16, 18 | Measured on the sample or described in a signed annex, with identical wording for every bidder. |
| Clarification item, never a filled number | Delivery days, local stock, SLA hours, price band | Listed with a named owner and a deadline; no figure is invented in the published specification. |
| Why the split matters | Scoring a binary requirement as a gradient is the most common source of a bid protest in school procurement. | |
Before and after: what the checklist changes
| Without the checklist | With all 18 points filed |
|---|---|
| "About 20 classrooms" in a cover note | A signed room schedule with IDs, types, phases and a spare allowance |
| Diagonal chosen from a catalogue | Diagonal resolved from the farthest seat with the published size tool |
| "Eye care" and "Google apps available" accepted as features | A licensed, model-level platform gate and a demonstrated physical-control test |
| Certificates filed as photocopies | One indexed compliance folder tied to the delivered serial range |
| Local service promised verbally | A signed annex naming the entity, covered cities, spares and escalation |
| Payment on shipment, complaints in year two | Milestones following per-room acceptance under 180 Day Payment Terms |
| Demo unit on a newer build | Frozen model, serial, firmware and checksum before demonstration |
| Training counted by headcount | Role-based attendance and a five-task competency sign-off |
| No answer to "which build is in room 14?" | Console export, asset register and annual review report |
- Write the room schedule before the technical volume: it decides half the checklist.
- Put binary requirements in the mandatory list: EDLA, warranty, authorisation, acceptance acts.
- Require one document per claim: a compliance matrix row without a page reference is not evidence.
- Freeze the sample build: the demonstrated unit must be the delivered unit.
- Tie payment to accepted rooms: commercial and evidence schedules advance together.
- Close the serial chain: certificate → QC → aging → calibration → acceptance act → asset register.
- Hand over the console, not just the remote: the school must be able to run year three itself.
- Standardise later batches: OEM / ODM / CKD / SKD keeps glass, firmware and spares identical.
Korduma kippuvad küsimused
These are the questions usually raised by school IT teams, procurement committees and distributors using a school interactive panel procurement checklist in a school procurement file, especially where the selection criteria mix gates with scored features.
Why exactly 18 points, and how are they grouped?
Six decisions, three items each: quantify demand (01–03), technical floors (04–06), certification and warranty (07–09), local service (10–12), payment and acceptance (13–15), and training with handover (16–18). Three per group is enough to cover the decision without turning the checklist into a catalogue, and every item ends with one closing document.
Who owns points 01–03?
The school. Academic affairs and facilities sign the room schedule, the workload profile and the size calculations before the technical volume is drafted. A vendor should not be asked to guess how many classrooms a district has, which languages are taught or how far the back row is from the teaching wall. Those three items are inputs, not bid responses.
Which items are mandatory gates rather than scored features?
Ten of the eighteen: 01, 02, 04, 05, 07, 08, 10, 13, 14 and 17. They are binary — a signed room schedule, a size calculation, a technical floor, model-level EDLA evidence, a compliance pack, a consistent three-year warranty, a named legal entity, acceptance-linked terms, per-room acceptance acts and an admin handover. A lower unit price cannot trade them away. The remaining eight are measurable commitments scored with identical wording for every bidder.
What technical floor should be written for the panel?
4K UHD ultra-HD output, 40–100 point infrared touch, sub-6 ms response time and a three-year warranty — all four are published on Qtenboard's homepage. Add a demonstration of the declared simultaneous-touch requirement on the sample unit, because a datasheet maximum is not a like-for-like measurement. Then add the platform gate: Official Google EDLA, Secure Access, Long-Term Support and Certified Android with Android Enterprise Device Compliance.
Why is EDLA a gate and not a scored advantage?
Because it is a licence, not a feature. Either the delivered model is covered by official Google EDLA certification with licensed GMS inside a validated build, or it is not; a sideloaded package or a browser shortcut creates no entitlement and no update obligation. Scoring a yes/no field as a gradient invites a bid protest. Put it in the mandatory list and score what actually varies: patch route, concurrency, training and service.
Which documents belong in the compliance folder?
Model-level Google EDLA evidence, EDLA · ISO 9001 · CE · FCC documentation, ROHS certified environmentally safe materials, FCC authorised wireless modules, ISO 9001 approved strict full-process quality control, Google EDLA Certified with Android Enterprise Device Compliance, EPEAT Gold and ENERGY STAR documentation, the Warranty Policy, and QC and 24-hour aging records. One index, one model code, one legal name on every cover sheet.
Is IEC 62471 listed on the compliance panel?
No. Qtenboard's published Certifications & Compliance panel lists ROHS, FCC authorised wireless modules, ISO 9001, Google EDLA Certified with Android Enterprise Device Compliance, EPEAT Gold and ENERGY STAR, alongside the EDLA · ISO 9001 · CE · FCC and 3 Years Warranty Support statement. Where a school requires photobiological safety evidence, request a model-level IEC 62471 laboratory report for the delivered configuration and file it in the same folder rather than treating it as a standing badge.
What factory records should be tied to serial numbers?
QC sheet, 24-hour aging record, motherboard test, touch calibration and sample identifier, all against the delivered serial range. Qtenboard's published factory video documents in-house SMT, touch bonding, metal chassis production and 24-hour aging QC at its Shenzhen facility, and its factory-audit News guide names motherboard testing, touch calibration and spare-parts logistics as the three checks before an OEM contract.
How should local service be specified without inventing coverage?
Require a named legal entity, a Manufacturer's Authorisation Letter, a signed service annex with covered cities and response commitments, a spare-parts list with a same-batch or same-model matching rule, and a named escalation contact. Qtenboard publishes its sales manager line, info@qtenboard.com and its Longgang District, Shenzhen address as the manufacturer-side route. Response times and stock levels that are not public become clarification items with a named owner, not numbers in a specification.
How do 180 Day Payment Terms work in practice?
Payment milestones follow acceptance of delivered batches rather than shipment dates: a portion on the signed compliance folder, a portion on each accepted room or batch, and the balance at final handover. Each milestone references a per-room acceptance act with its serial number and firmware version. Incoterms, duties and taxes are priced separately so the commercial comparison stays like-for-like.
Why one acceptance act per room instead of one project certificate?
Because complaints are individual. A per-room act records 4K output, full-surface calibration, port enumeration, physical buttons, enrolled account, firmware version, eye-care preset and a brightest-hour farthest-seat reading against one serial number. A single "project complete" certificate gives a technician in year two nothing to reproduce the problem with.
What happens if the demo unit runs a newer firmware build?
It is recorded as a discrepancy, not treated as an improvement. Record model code, serial number, firmware version and checksum before the demonstration. The Interactive Flat Panel Bid Control Solution keeps the technical volume, the sample record, the compliance matrix and the delivered serial range on one controlled configuration.
Which published tools help with room sizing?
The Interactive Flat Panel Size Calculate Tool for a single teaching surface and the LCD Video Wall Size Calculate Tool for a tiled array. Both work from viewing distance and the farthest seat. Where one diagonal cannot resolve the back row, the specification can name an IFP plus a side commercial display panel instead of an oversized single surface.
What should teacher training cover?
Role-based, task-based sessions: open a Drive lesson, annotate and save, start a Meet session, switch input, use the eye-care and recording physical buttons, and recover from a disconnected cable. Qtenboard publishes EN, spa, pt, vie, th, est, lav, aze, ukr, bel and ru interfaces and V100 software operation material; the school owns the local-language quick cards. Record attendance by role and a five-task competency sign-off, not just a headcount.
What exactly is handed over to the IT desk?
The console, asset register, firmware baseline, managed Play allowlist, CMS preset map, compliance folder, warranty policy, spare-parts list and escalation contact as one indexed set, plus a demonstrated remote policy push, app distribution, patch-status export and managed wipe. The test is simple: the desk can answer which build is in a given room and who to call about it without contacting the vendor.
What does the annual review check?
Firmware, patch level and last check-in exported for the fleet; certificate validity, warranty status, spare inventory and escalation contact re-verified; the sample bench repeated after any OTA that changes the graphics, scheduling or backlight stack; and a decommissioning procedure with remote policy removal, managed wipe, account revocation and asset-register closure. Point 18 is what keeps points 01–17 true in year three.
How do we start a checklist-based tender?
Write the room schedule, workload profile and size calculations first. Then issue the eighteen items with gates and scored commitments separated, a single compliance-folder template and identical clarification wording for every bidder. Qtenboard can supply its published compliance pack, product datasheets, factory-audit material, size-tool outputs and a batch schedule aligned to the academic calendar and the 180 Day Payment Terms.
Building an 18-point tender pack for your schools?
Qtenboard supplies EDLA-certified interactive whiteboards with 4K UHD output, 40–100 point infrared touch, sub-6 ms response, a three-year warranty, model-level compliance documentation, 180 Day Payment Terms and OEM / ODM / CKD / SKD options from its Shenzhen manufacturing base. Request the compliance pack and checklist template.

EN
spa
pt
vie
th
est
lav
aze
ukr
bel
ru